A Configuration Management Model For New Established Power Plant Engineering Design Document Application
Simple item page Statistics| Field | Value | Language |
|---|---|---|
dc.contributor.advisor |
陳照明、張保隆 | |
dc.contributor.advisor |
Jaw-Ming Chen、Pao-Long Chang | |
dc.contributor.author |
張永昌 | |
dc.contributor.author |
Yung-Chang Chang | |
dc.contributor.college |
管理學院 | |
dc.contributor.committee |
||
dc.contributor.committee |
||
dc.contributor.department |
經營管理研究所 | |
dc.contributor.studentid |
8531516 | |
dc.date.NCLavailable |
||
dc.date.USTavailable |
||
dc.date.issued |
||
dc.date.issuedROC |
||
dc.date.paperavailable |
立即公開 | |
dc.date.schoolyear |
87 | |
dc.description.abstract |
過去電廠在建廠階段由於工程設計資料之管理缺乏一套整合性工作流程,以致發生資料蒐集不足、編號系統混亂、缺乏設計基準、設計變更評估不確實、資料查詢困難及儲存不易等問題。應用型態管理及電腦化於工程設計資料之管理,以提升電廠運轉安全及經濟效益,預防錯誤或疏失。本研究係彙整工程設計資料相關管理理論,歸納型態管理之內容及其優點,然後推導出適合於新建電廠工程設計資料管理作業流程及模式。研究之結果提供一套具體型態管理架構,以解決電廠工程設計資料管理上之缺失;包含以下七點:1.建構電廠系統及選定型態項目. 2.訂定編號系統. 3.建立設計基準. 4.將設計資料轉換成電子資料形式. 5.增加設計變更評估項目. 6.應用電腦化技術建立資料關連性. 7.應用型態現況反映及電腦化以解決上述缺失。本研究可提供專案計畫決策人員參考,要求將相關作業或規定納入合約中,強制承包商遵行,並訂定相關作業程序書,要求企業同仁遵循以提高工程品質及生產力。 | |
dc.description.abstract |
The Electrical Distribution System Functional Inspections (EDSFI) has recently identified the deficiencies of the nuclear power plant, such as incomplete control and documentation of plant design changes, problems of data management retrieval and updating, incomplete as-built information and incomplete verification of design. Therefore, it is required to build a management model to integrate design document control processes suitable for power plants to know precisely their as-built condition at all times in its life. Configuration management (CM) model is a methodology to ensure each equipment / item can meet its functional and physical requirements and changes are rigidly controlled, well documented, and accurately conformed to original design criteria. The ultimate goal of this study is to work out a delicate CM model especially suitable for the newly established power plants through integrating the related EDD management theories and adopting the advantage in CM. As a consequence, with an eye to fixing the defects identified in a power plant*s EDD management, a concrete CM model with seven essential points is advanced: 1. To build a system structure of the plant and select the items of CM. 2. To develop a numbering system. 3. To set up the design criteria. 4. To transform hardcopy to electronic files. 5. To add up items for evaluating changes in design. 6. To establish the relationships of documents. 7. To apply computers as the powerful tool to implement CM. The study conclude that CM can provide a guideline for the management of EDD and has a positive effect on the engineering quality and productivity. | |
dc.description.abstractopendate |
||
dc.description.degree |
碩士 | |
dc.description.tableofcontents |
目錄頁次中文摘要 Ⅰ英文摘要 Ⅱ誌謝 Ⅲ目錄 Ⅳ圖目錄 Ⅶ表目錄 Ⅸ第一章 緒論1.1 研究動機 11. 2 研究目的 31.3 研究方法 31. 4 研究流程 41.5.研究架構 5第二章 文獻探討2.1 工程設計資料之管理 62.1.1 ISO 關於工程設計資料作業之管理 102.1.2 有關工程設計資料變更之文獻 112.1.3 使用電腦輔助工程設計資料處理 122. 2型態管理 142. 2.1型態管理之定義 142. 2.2型態管理之應用 182.2.3型態管理在專案管理中之角色 20第三章 建構以型態管理為基礎之新建電廠工程設計資料管理架構3. 1電廠工程設計資料與建廠及營運之關係 213.2 型態管理與工程設計資料管理之關係 243.3型態管理之範圍及作業流程 263.4 以型態管理為基礎之電廠工程設計資料管理架構 31第四章 新建電廠工程設計資料管理成效之檢討及改進4. 1利用適合於電廠之型態管理架構,檢討目前工程設計資料管理之缺失 424.2 新建電廠工程設計資料管理系統之分析與檢討4. 2.1建構電廠系統及選定型態項目以解決資料蒐集不足問題..464. 2.2訂定編號系統以解決分類編號不當問題 544.2.3 建立設計基準以解決設計基準不完整之缺失 574. 2.4將設計資料轉換成電子資料形式以解決資料儲存問題 594.2.5增加評估項目,改善設計變更作業評估不實缺失 654.2.6應用電腦化技術建立資料關連性以解決資料維護之問題 684. 2.7應用型態現況反映及電腦化以解決設計資料查詢不易問題 754. 3型態管理在電廠工程設計資料管理之實施 774. 4電廠實施型態管理之預期效益 79第五章 結論與建議5. 1結論 835. 2建議 84參考文獻 86簡歷表 93 | |
dc.identifier.citation |
[1] 王河星,e型態管理模式之建構f,台北技術學院學報第28-2期,pp101-108,七月,民國84年。[2] 王彝萍,型態管理,中山科學研究院航空發展中心, 民國85年。[3] 台灣電力公司,e第一二號機竣工報告f,核一施工處,民國70年6月。[4] 台灣電力公司,e第二核能發電廠竣工報告 f,民國73年11月。[5] 台灣電力公司,e第一二號機竣工報告f,核三施工處,民國75年3月。[6] 台灣電力公司,e核電廠營運整體研究f,民國81年。[7] 台灣電力公司,"Lungmen Nuclear Island Project Specification NO. 874-MS-001-1",Appendix N,民國85年。[8] 朱素琴, eISO-9000文件管理f,電子電力技術雙月刊,十月號,pp.92-99, 民國86年。[9] 杜全根,江慎吳,e艦艇構型管理資訊系統f,第四屆軍艦工程研討會論文集,pp. 245-250, 民國85年。[10] 林仁常, e資料庫管理系統理論與實務f,全華科技圖書,民國84年6月。[11] 吳中天, e工程變更管理作業之研究f,碩士論文,清華大學,民國85。[12] 施伯翰, e組態作業系統之資料庫與人機界面設計f,清大碩士論文,民國87年。[13] 美國聯邦法規 NUREG,10CFR50.2[14] 美國核能運轉協會INPO -87-006,"Report On Configuration Management In The Nuclear Utility Industry", JULY,民國76年。[15] 原能會,e核三廠 EDSFI稽查報告f, (82)會核字第23393號函,民國83年1月。[16] 陳振楠,戴印生,劉如凱, e同步工程在整體後勤支援規劃之研究f,第三屆國防科技學術研討會論文集,PP.387 -396 , 民國83。[17] 陳達平, e核電廠構型管理電腦化作業考察f,民國80年。[18] 陳宗德, e組態進行之組裝分析f,國立中山大學碩士論文,民國87年。[19] 陳世榮, e設計變更管理系統參考模型f, 碩士論文,交通大學,民國85年。[20] 許德安, e電腦主從架構方式於整合性工程圖說文件管理之應用 f, 82年電子計算機於土木水利工程應用論文研討會論文集, pp.1263-1272, 民國82年。[21] 焦永寧等,核能電廠DCC現代化研究,13~15頁,民國79年9月。[22] 張執中,e產品資料管理之系統架構-探討其執行程序與資料模式f,國立清華大學,碩士論文,民國85年。[23] 彭定國, e建構以STEP資料模組為基礎之工程資料管理系統f ,清大博士論文,民國86年。[24] 資策會,軟體發展程序,民國75年。[25] 蔡宗憲,e工程資訊管理f,CAD與自動化,七月號,pp.13-17,民國83年。[26] 鄭雅雄, e構型管理 f,台電核能月刊,2~21頁,民國77年11月。[27] Atkinson, D., and Glasscock, A. ,"An Implementation of A Product Data Management System", Proceeding of the ASME International Computers in Engineering Conference and Exposition, Boston, MA,USA,pp37-49,1990.[28] Alan Fowler, "Case Experience Of Implementing Configuration Management In A UK Shipbuilding Organization",International Journal Of Project Management, Vol. 14,No. 4 ,pp.221-230, 1996.[29] Brian K. Grimes ,"NRC Perspective on Configuration programs", BWR Configuration Management Conference, New Orleans, Louisiana, Oct 7,1991.[30] Boznak, R. G.," Configuration Management-The Next Engineering Management Revolution", In Managing Technology In A Competitive Environment :2nd International Conference On Engineering Management, IEEEE, TORONTO, pp207-210,1989.[31] Chen, Y. M., Ho, C. T.,"A Computer-based Product Data Management Framework For Team-Oriented Design", The Fourth International Conference On Automation Technology,Vol.19, Hsinchu, Taiwan, July,pp203-210,1996.[32] Christiansen, E.G .,"What Is Configuration Management ? , "Proceedings Of 26th Annual Technical Conference Transaction,ASQC,pp.245-252,1972.[33] Chalmet, L.G, De Bodt, M., and Van Wassenhove, L.,1985,"The Effect Of Engineering Changes And Demand Uncertainty On MRP Lot Sizing:A Case Study," International Journal of Production Research ,Vol.23,pp233-251.[34] Clemeny,J., Coldrick, A., And Sari, .J," Manufacturing Data Structure: Building Foundation For Excellence With Bills Of Materials And Process Information," Oliver Wight Limited Publications,Inc.,VT,1992.[35] Collier,W., "Realizing PIM potential,", Computer-Aided Engineering,Vol.14,NO.9, pp44-46,1995.[36] Collier,W., "Coveraging on product information management. Computer-Aided Engineering,Vol.14,NO.6,pp64-74,1995.[37] Daniels," Principles of construction management", Automated Graphic System ,Inc., White Plans, MA ,1985.[38] Dori,D., Gal,A, and Etzion.o., "A Temporal Database With Data Dependences: A Key To Computer Integrated Manufacturing,", Integration Journal of Computer Integrated Manufacturing System,Vol.15,NO.1.,1996.[39] Fowler,, A., "Model And Applications Of Configuration Management", OMEGA International Journal Of Management Science, Vol. 21,No. 4,pp425-431,1993.[40] ISO 9001, e品質記錄之管制 f,4.16節,民國83年。[41] ISO-10007, Guideline For Configuration Management,型態管理指引, 民國84年。[42] Koonce, D. A., "Information Model Level Integration For CIM System" Computer & Industrial Engineering ,Vol.29 . No.1-4,pp647-651,1995.[43] Lacy, J. A., "Management Of System Engineering", Mcgraw- Hill, Inc.1992.[44] Manfred Saynisch and Hermann Burgers :"General aspects of configuration Management", International Journal of Project Management", Vol.15,N0.5,pp.331-333,1997.[45] Merlenbath, C., "Importance Of Configuration Management. A Overview With Test Program sets", Proceedings Of 48th Annual Forum Of The American Helicopter society, Washington DC, VIRGINIA, 1992.[46] Miranda, A. S., And Locke, T. M.,"Development Of An Engineering Product Data Management System", Proceedings Of The ASME International Computers In Engineering Conference And Exposition,Boston,MA,USA,pp.23-29,1990.[47] Miller, E., "PDM Today", Computer-Aid Engineering, Vol.14, No.2, pp31-34,1995.[48] MIL-STD-973,Configuration Management,1992.[49] PATEL, A. C., "Integration Of Product Information Residing On Various Computer System,", CASA/SME AUTOFACT Conference,1990.[50] Peng, T. K., And Trappey, A. J., "Modeling Product Structures And Engineering Changes Using Express Representation Schema", Proceedings Symposium On Advanced Product Data Management, Med-Vol.4, ASME, Nov pp17-22,Atlanta, Georgia, USA.[51] Phillips,C., "Controlling And Managing Engineering Change, "Manufacturing System,pp.40-42,1987.[52] Rickabaugh, J., "Configuration Management The Hidden Friend In Business Reengineering", IE, August 1994.[53] Rusk, P. S., "The Role Of The Bill Of Material In Manufacturing System," Engineering Cost And Production Economics, Vol. 19, pp.205-211,1990.[54] Shtub, A. and Bard, j., "Project Management Engineering, Technology And Implement", Practice Hall International Inc. 1994.[55] Siegal,J. ,Foley, D., "Hands-On Product Data Management", Computer Aided Engineering,Vol.4, No.2,pp42-48,1995.[56] Siegal, J., "Hands-On Product Data Management,,", Computer-Aided Engineering,Vol.14,NO.2, pp42-48,1995.[57] Stamps, D. "Survival Software for Manufacturing" , DATAMATION, Vol. 36,pp81,1990.[58] Stevens, C. A., And Wright, K., "Managing Change With Configuration Management", National Productivity Review, pp.509-518,1991.[59] Turner, J. R., "The Handbook Of Project Based Management", McGRAW. HiLL, LONDON,1993.[60] Thomas T. Samraras, "A Modern Approach for Assuring That Product Meet Customer Requirement", Configuration Management Deskbook,1998.[61] Tiwari, S. Franklin, H. A., "Automated Configuration Management In Concurrent Engineering Project", CE, Research And Application, pp149-161,1994.[62] Urban, S. D.,"A Heterogeneous Active Database Architecture For Engineering Data Management", International Journal Of Computer Integrated Manufacturing,Vol.7, No. 5,pp276-293,1994.[63] Veith,W., "Configuration Management", Mechanical Engineering,pp20-25,1967.[64] Wang, C. Y. And Fulton, R. E., "Information System Design For Optical Fibre Manufacturing Using An Object-Oriented Approach", International Journal of Computer Integrated Manufacturing, Vol. 7,No. 1,pp61-73,1994. | |
dc.identifier.uri |
https://hdl.handle.net/20.500.14371/16396 | |
dc.language.iso |
中文 | |
dc.relation.alma |
990050228120206772 | |
dc.relation.page |
93 | |
dc.subject.keyword |
型態管理 | |
dc.subject.keyword |
電廠 | |
dc.subject.keyword |
工程資料管理 | |
dc.subject.keyword |
Configuration Management (CM) | |
dc.subject.keyword |
Power Plant | |
dc.subject.keyword |
Engineering Design Document Management | |
dc.title |
應用型態管理於新建電廠工程設計資料管理之研究 | zh-TW |
dc.title |
A Configuration Management Model For New Established Power Plant Engineering Design Document Application | en |
dc.type |
Thesis | zh-TW |