乾縮潛變對預力混凝土橋樑之影響
顯示簡易詮釋資料 統計資料| 欄位 | 內容 | 語言 |
|---|---|---|
dc.contributor.advisor |
林昌佑 博士 | |
dc.contributor.advisor |
Dr. LIN CHANG YU | |
dc.contributor.author |
莊建銘 | |
dc.contributor.author |
CHUANG JEN MING | |
dc.contributor.college |
工學院 | |
dc.contributor.committee |
||
dc.contributor.committee |
||
dc.contributor.department |
土木工程研究所 | |
dc.contributor.studentid |
8716526 | |
dc.date.NCLavailable |
||
dc.date.USTavailable |
||
dc.date.issued |
2000 | |
dc.date.issuedROC |
89 | |
dc.date.paperavailable |
立即公開 | |
dc.date.schoolyear |
89 | |
dc.description.abstract |
近年來節塊式的預力混凝土橋樑在國內各項公路橋樑大量被採用,由於其採用的是階段性分段構築,對乾縮潛變的敏感度相當高。一旦在設計過程沒有加以精確估算納入考量,很可能會對橋樑的安全性及耐久性造成很大的影響。國內已有數座橋樑因為乾縮潛變衍生出的問題而需大規模整修甚至拆除重建,足見我們無法去忽視乾縮潛變對預力混凝土橋樑的影響。 本研究從混凝土的乾縮潛變機制出發,進而探究和乾縮潛變相關的理論與預測模式,以及橋樑實務中所面臨到的乾縮潛變問題與解決方法。其中特別針對階段性施工橋樑特別需加以注意的齡期效應加以探討。有心深入瞭解乾縮潛變問題的朋友本文應可做一參考。 | |
dc.description.abstract |
In recent years, a lot of segmental prestressed concrete bridges were constructed on Taiwan's highway. Because they were built in many segments in different time, they all have high sensibility to creep and shrinkage. If one does not consider the problem carefully, it may have bad influence on the safety and durability of the bridge. In fact, there have already several bridges must be repaired or torn down because of creep and shrinkage. So the effect of creep can't be ignored on the prestressed concrete bridges. In this research, the basic models of creep and shrinkage are studied. An example is made to investigate these models. And the effects to these prestressed concrete bridges are discussed. | |
dc.description.abstractopendate |
||
dc.description.degree |
碩士 | |
dc.description.tableofcontents |
目 錄第一章 緒論 ……………………………………………………………………… 11.1 研究背景 …………………………………………………………………… 11.2 研究動機與目的 …………………………………………………………… 11.3 本文內容 …………………………………………………………………… 2第二章 混凝土乾縮潛變起因與影響因素 ………………………………………. 32.1 混凝土變形 ………………………………………………………………… 32.1.1 變形分類 ………………………………………………………………. 32.1.2 瞬時變形 ………………………………………………………………. 32.1.3 延遲應變 ………………………………………………………………. 42.2 混凝土的潛變 ……………………………………………………………… 52.2.1 潛變的機制 ……………………………………………………………. 52.2.2 潛變變形的線彈性與疊加性 …………………………………………. 62.3 影響潛變的因素 …………………………………………………………… 72.3.1 混凝土的齡期 …………………………………………………………. 82.3.2 溼度 ……………………………………………………………………. 82.3.3 試體斷面尺寸 …………………………………………………………. 82.3.4 水泥種類及添加劑 ………………………………………………….. 92.3.5 骨材 ………………………………………………………………….. 92.3.6 水灰比 ……………………………………………………………….. 102.3.7 養護環境與方法 …………………………………………………….. 102.3.8 環境溫度 …………………………………………………………….. 112.3.9 混凝土種類 ………………………………………………………….. 112.4 混凝土乾縮機制 …………………………………………………………. 112.5 影響乾縮的因素 …………………………………………………………. 122.5.1 齡期 ………………………………………………………………….. 132.5.2 外在環境 …………………………………………………………….. 132.5.3 水灰比、水泥種類及溫度 ………………………………………….. 132.5.4 試體形狀 …………………………………………………………….. 14第三章 混凝土乾縮潛變預測模式發展 ……………………………………… 153.1 混凝土潛變律簡介 ………………………………………………………. 153.1.1 潛變-時間關係表示法 …………………………………………….. 153.1.2 潛變律之發展 ……………………………………………………….. 173.2 混凝土乾縮潛變預測模式 ………………………………………………. 193.2.1 ACI 209模式 ………………………………………………………… 203.2.2 CEB-FIP 1978模式 ………………………………………………….. 233.2.3 Bazant and Panula 1978模式 ………………………………………… 253.2.4 Australian Standard for Concrete Structure,AS3600(1988)……….. 283.2.5 BP-KX Model ………………………………………………………… 29第四章 乾縮潛變對預力混凝土橋樑之影響 ………………………………….. 354.1 預力損失 …………………………………………………………………. 354.1.1 預力損失的產生 …………………………………………………….. 354.1.2 乾縮潛變造成之預力損失計算 …………………………………….. 364.1.3 超估或低估預力損失之影響 ……………………………………….. 374.2 裂縫 ………………………………………………………………………. 384.2.1 乾縮產生的裂縫種類 ………………………………………………. 384.2.2 減少乾縮裂縫之方法 ……………………………………………….. 394.3 不同混凝土乾縮潛變預測模式之比較 …………………………………. 40第五章 結論與建議 …………………………………………………………….. 425.1 結論 ………………………………………………………………………. 425.2 建議 ………………………………………………………………………. 43參考文獻 ………………………………………………………………………….. 45 | |
dc.identifier.citation |
參 考 文 獻【1】 Zden?k ?merda & Vladimir K?istek , Creep and Srinkage of Concrete Element and Structures , Czechoslovakia , 1988 .【2】 Gvozdyev, A. A.:Creep of Concrete in:Mechanics of solid body.(In Russian.)Stroyizdat, Moscow, 1966.【3】 Alexandrovskiy, S. V.:Analysis of concrete and reinforced concrete structure for changes of temperature and humidity with consideration of creep.(In Russian.)Stroyizdat, Moscow, 1973.【4】 L'Hermite, R. G. & Mamillan, M., Further results of shrinkage and creep tests, Proc. Int. Conf. On the Structure of Concrete, Cement and Concrete Association:London, 1968, pp. 423-33.【5】 Hummel, A.:Vom Einfluss der Zementart, des Wasserzementverhaltnisses und des Belastungsalters auf das Kriechen von Beton. Zement-Kalk-Gips 12, 1959, NO. 5.【6】 Ngab, A. S., Nilson, A. H. & Slate, F. O., Shrinkage and creep of high strength concrete, ACI Journal, 78, NO. 4, July 1981,pp. 251-261.【7】 Troxell, G. E., Raphael, J. M.& Davis, R. E., Long-time creep and shrinkage testsof plain and reinforced concrete, Proc. ASTM, 58, 1958,pp. 1101-20.【8】 ACI Committee 517. Low Pressure Steam Curing. ACI Journal, Proc. 60, 1963.【9】 Hanson, J. A.:Prestress Loss as Affected by Type of Curing. Prestressed Concr. Inst. Journal, 9, 1964.【10】 Hannant, D. J., The strain behavior of concrete under compressive stress at elevated temperatures, Report NO. RD/L/N67/66, Research and Development Department, Central Electricity Generating Board, June 1966, 30 pp.【11】 Mohammad M. Smadi, Floyd O. Slate&Arthur H. Nilson, Shrinkage and creep of high-, medium-, low-strength concretes, including overloads, ACI Material Journal /May-June 1987, pp24-34.【12】 Die materialtechnischen Grundlagen und Probleme des Eisenbetons in Hinblick auf die zukunftige Gestaltung der Stahlbeton-Bauweise. EMPA, Bericht 162, 1952, Zurich.【13】 Creep of bridges(In Czech.)VUIS Bratislava, Report on problem NO. P 12-526-072/2.5, 1975.【14】 Straub, L. G.," Plastic flow in concrete arches", Proc. Am. Soc. of Civil Engineers, 56, Jan. 1930, pp. 49-114.【15】 US Bureau of Reclamation, "Creep of concrete under high intensity loading", Concrete Laboratory Report NO. C-820, Denver, Colorado, April 1956, 6 pp.【16】 McHendry, D.," A new aspect of creep in concrete and its application to design", Proc. ASTM, 43, 1943, pp. 1069-84.【17】 Ross, A. D.," Concrete creep data", The Structural Engineer, 15, NO. 8, 1937, pp. 314-26.【18】 Ba?ant, Z. P. and J. C. Chern ,"Concrete creep at variable humidity:Constitutive Law and Mechanism", RILEM, Vol. 18, NO. 103, 1985, pp. 1-20.【19】 Ba?ant, Z. P. and Osman E.," Double power law for basic creep of concrete', Materials and Structures(RILEM Paris), Vol. 9, NO. 40, 1976, pp. 3-11.【20】 Ba?ant, Z. P. and J. C. Chern ,"Triple power law for concrete", Journal of Engineer Mechanic, ASCE, Vol. 111,1985, pp. 63-83【21】 吳泳佶,"混凝土之潛變律暨其受溼度影響之分析與試驗",國立台灣大學土木工程研究所結構組碩士論文,1987。.【22】 Chern J. C., Wu Y. G.& Chang H. C., "The influence of loading age on long-term drying creep of concrete", Journal of the Chinese Institute of Engineers, Vol. 11, NO. 2 ,1988, pp. 113-120.【23】 Ba?ant, Z. P. and JOONG-KOO KIM., "Improved prediction model for time-dependent deformations of concrete:Part 2-Basic Creep", Materials and Structures, 1991.24, pp.409-421.【24】 ACI Committee 209, Prediction of creep, shrinkage and temperature effects in concrete structures, 2nd Draft, ACI, Detroit, pp. 98.【25】 CEB-FIP," Model code for concrete structures", Comite Euro-International du Beton-Federation Internationale de la Precontrainte, Paris, pp. 348, 1978.【26】 Ba?ant, Z. P., Panula L., "Practical predictions of time dependent deformation of concrete ", Part I-V, Materials and Structures, Paris, Vol. 11, NO. 65, pp. 301-328, Vol. 11, NO. 66, pp. 415-424, 1978, Vol. 12, NO. 69, pp.169-183, 1979.【27】 Standard Association of Australia, "Australia Standard for Concrete Structure-AS 3600-1988, Sydney, 1988.【28】 Ba?ant, Z. P. and JOONG-KOO KIM., "Improved prediction model for time-dependent deformations of concrete:Part 1-Shrinkage", Materials and Structures, 1991.24, pp.327-345.【29】 Ba?ant, Z. P. and JOONG-KOO KIM., "Improved prediction model for time-dependent deformations of concrete:Part 1-Creep at Drying", Materials and Structures, 1992.25, pp.21-28.【30】 李鎮宏,"混凝土乾縮潛變預測模式之現況探討與研究",國立台灣大學土木工程研究所結構組碩士論文,1996。.【31】 蔡俊鐿、劉以毅,"預力混凝土橋樑節塊施工法乾縮潛變效應之探討",結構工程,第十卷,第三期,民國84年9月,pp.101-108.【32】 Branson, D. E., "Deformation on concrete structures, McGraw-Hill, New York, 1977, 546pp.【33】 Zia, P., Preston, H. K., Scott, N. L.&Workman, E. B., "Estimating prestress losses", Concrete International, Vol. 1, NO. 6, June 1979, pp. 32-38.【34】 Jacques Mathivat, "The cantilever construction of prestress concrete bridges", 1'Ecole National despont et Chau'ees, Paris, France.【35】 Trost, H., "Auswirkungen des Superpositionsprinzip auf Kriech-und Relaxations-probleme bei Beton und Spannbeton", Beton- und Stahlbetonbau, 62, NO. 10, 1967, pp.230-8, NO. 11, 1967, pp. 261-9.【36】 林楚儒,''節塊施工的連續預力梁之分析與設計",中華民國八十四年二月文笙書局。 | |
dc.identifier.uri |
https://hdl.handle.net/20.500.14371/20003 | |
dc.language.iso |
中文 | |
dc.relation.alma |
990008768710206772 | |
dc.relation.page |
77 | |
dc.subject.keyword |
乾縮 | |
dc.subject.keyword |
潛變 | |
dc.subject.keyword |
預力混凝土橋樑 | |
dc.subject.keyword |
預力損失 | |
dc.subject.keyword |
shrinkage | |
dc.subject.keyword |
creep | |
dc.subject.keyword |
prestress concrete bridge | |
dc.subject.keyword |
prestress loss | |
dc.title |
乾縮潛變對預力混凝土橋樑之影響 | zh-TW |
dc.title |
A Study of Creep and Shrinkage Effects on Prestress Concrete Bridges | en |
dc.type |
Thesis | zh-TW |
檔案
本條目沒有附加檔案。
所屬典藏: 土木工程學系