以系統模擬方式優化自行車車架製造廠生產排程作業
顯示簡易詮釋資料 統計資料| 欄位 | 內容 | 語言 |
|---|---|---|
dc.catalog.0080 |
240919 | |
dc.catalog.00818 |
a | |
dc.catalog.00818 |
d | |
dc.catalog.00818 |
| | |
dc.catalog.00818 |
| | |
dc.catalog.0087 |
2023 | |
dc.catalog.020 |
平裝 | |
dc.catalog.041 |
chi | |
dc.catalog.041 |
eng | |
dc.catalog.300c |
30 | |
dc.contributor.advisor |
張永佳 | |
dc.contributor.advisor |
Chang, Yung-Chia | |
dc.contributor.author |
呂采玲 | |
dc.contributor.author |
Lu, Cai-Ling | |
dc.contributor.campus |
光復 | |
dc.contributor.college |
管理學院 | |
dc.contributor.committee |
||
dc.contributor.committee |
||
dc.contributor.department |
工業工程與管理學系 | |
dc.contributor.dpcode |
IEENG | |
dc.contributor.idpcode |
3704 | |
dc.contributor.studentid |
310704034 | |
dc.date.NCLavailable |
2028/08/28 | |
dc.date.USTavailable |
2028/08/28 | |
dc.date.issued |
2023 | |
dc.date.issuedROC |
112 | |
dc.date.paperavailable |
立即公開 | |
dc.date.schoolyear |
112 | |
dc.description.abstractopendate |
2028/08/28 | |
dc.description.degree |
碩士 | |
dc.identifier.uri |
https://hdl.handle.net/20.500.14371/255 | |
dc.language.iso |
中文 | |
dc.relation.page |
53 | |
dc.subject.keyword |
等效平行機台排程問題 | |
dc.subject.keyword |
多樣生產環境限制 | |
dc.subject.keyword |
基因演算法 | |
dc.subject.keyword |
系統模擬 | |
dc.subject.keyword |
數位轉型 | |
dc.subject.keyword |
Equivalent parallel machine scheduling problem | |
dc.subject.keyword |
Diverse Production Environment Constraints | |
dc.subject.keyword |
Genetic Algorithm | |
dc.subject.keyword |
System Simulation | |
dc.subject.keyword |
Flexsim | |
dc.subject.keyword |
Digital Transformation | |
dc.title |
以系統模擬方式優化自行車車架製造廠生產排程作業 | zh-TW |
dc.title |
Applying System Simulation to Optimizing Production Scheduling for Bicycle Frame Manufacturer | en |
dc.type |
Thesis | zh-TW |
檔案
全文將於 2028年8月28日 起公開。
所屬典藏: 工業工程與管理學系