應用可靠度為中心維修方式規劃軌道車輛維修階層之研究-以台鐵電聯車動力系統為例
顯示簡易詮釋資料 統計資料| 欄位 | 內容 | 語言 |
|---|---|---|
dc.contributor.advisor |
張新立 | |
dc.contributor.author |
凌宇康 | |
dc.contributor.author |
||
dc.contributor.college |
管理學院 | |
dc.contributor.committee |
||
dc.contributor.committee |
||
dc.contributor.department |
運輸與物流管理學系 | |
dc.contributor.studentid |
9332535 | |
dc.date.NCLavailable |
2006/09/11 | |
dc.date.USTavailable |
2006/09/11 | |
dc.date.issued |
2006 | |
dc.date.issuedROC |
95 | |
dc.date.paperavailable |
立即公開 | |
dc.date.schoolyear |
94 | |
dc.description.abstract |
隨著高速鐵路即將完工通車以及各縣市捷運系統興建規劃,軌道運輸在國內整體運輸系統之重要性日益增加。相較於新穎的捷運以及高速鐵路,興建多年而龐大複雜之城際鐵路係由台灣鐵路管理局經營,面對高鐵通車以及交通環境改變造成之營運衝擊,台鐵局計畫推動都會區鐵路捷運化以及內部組織調整等多項措施。軌道車輛系統中,以動力系統之可靠度影響列車正常營運最鉅,然台鐵局車輛近年來出現故障率大幅增加之狀況,嚴重影響列車運轉以及營運,造成乘車民眾不便,都會區鐵路捷運化後,路線容量將更趨飽和,則車輛故障引起之營運影響將更為嚴重。 國內軌道車輛維修規劃仍以預防性維修(Preventive Maintenance)觀念為主,本研究引進以可靠度為中心之維修方式(Reliability-Centered Maintenance, RCM)於軌道車輛維修作業之改善。該方式起源於航空業,規劃維修作業時根據可靠度觀念,掌握系統中關鍵項目以及因素,將維修資源做有效率的分配,進而以可靠度為基準建立最佳的預防性維修計畫,同時可以兼顧系統安全以及降低維修成本。本研究以台鐵EMU500型電聯車之動力系統作為RCM分析對象,並藉由維修成本、時間尋求適當之維修階層,以作為台鐵局未來改善維修作業以及調整組織架構之參考。 研究結果顯示,EMU500型電聯車動力系統之關鍵維修項目為屬於高壓設備次系統之集電弓,採取預定年限模式之預防性維修策略進行維修規劃,並以最小成本為前提選定維修時距,其可靠度以及維修成本均優於矯正性維修;而以計算所得之維修時距以及成本為基準,進行維修階層分析,可得機務段層級進行集電弓維修作業優於機廠層級之結果,顯示經過分析選定並調整之維修工作,確實可以提升軌道車輛系統可靠度,並節省維修成本。未來可應用於台鐵各式具備完整失效資料之車輛維修作業,並可作為未來維修階層精簡之參考依據。 | |
dc.description.abstract |
The reliability for the power system of rolling stocks is determined by the effectiveness and efficiency of its maintenance strategies. Recently, the increasing failures of the Electric Multiple Unit (EMU) power subsystem of Taiwan Railway Administration (TRA) have reduced the reliability of their service as well as the confidence of passengers. This study aims to analyze the potential of applying Reliability-Centered Maintenance (RCM) approach to inspect the system reliability of TRA rolling stocks. RCM is a systematic approach to develop a focused and cost-effective maintenance plan. Based on the quantitative reliability measure, RCM can help to explore the maintenance significant items (MSI) and distribute the maintenance resource efficiently. By applying RCM, both the system safety and expense saving can be achieved through such efficient maintenance procedure. This study shows that Pantograph is the first-priority MSI in the power subsystem. Applying the “Replacement at Predetermined Age” maintenance policy, the replacement interval with the minimum cost can be calculated. Furthermore, the minimum cost replacement interval executed in intermediate level (I level) is considered better cost-effective than that in depot level (D level) via the analysis of repair level. Results of this study point out that RCM is applicable in analyzing the railway rolling stock maintenance planning and provide valuable reference for the maintenance management of railway system in Taiwan. | |
dc.description.abstractopendate |
||
dc.description.degree |
碩士 | |
dc.description.tableofcontents |
目錄第一章 緒論 11.1研究背景與動機 11.2研究對象與範圍 21.3研究目的與內容 4第二章 文獻回顧與現況分析 52.1可靠度領域之相關文獻 5 2.1.1串聯系統 5 2.1.2並聯系統 62.2RCM模式之相關文獻 7 2.2.1RCM方法之執行步驟 7 2.2.2RCM方法之延伸 8 2.2.3維修工作之選定與最適維修工作之排程 9 2.2.4維修績效之評估 9 2.2.5RCM方法之應用 92.3韋伯分析之相關文獻 102.4軌道車輛維修文獻回顧與現況分析 11 2.4.1維修之定義 11 2.4.2維修型態 11 2.4.3維修階層 13 2.4.4小結 14第三章 研究方法與流程 15 3.1 RCM分析 15 3.2失效樹分析 20 3.3預防維修時距選定模式 26 3.3.1 固定區間更換策略 26 3.3.2 預定年限更換策略 27 3.4維修階層分析 28 3.5研究步驟與流程 30 3.5.1 研究步驟 30 3.5.2 研究流程 31第四章 RCM模式建立 32 4.1電聯車系統分析 32 4.2動力系統失效樹分析 34 4.2.1 展開失效樹結構 34 4.2.2 失效樹之定性分析 38 4.2.3 失效樹之定量分析 40 4.3失效模式、影響以及嚴重度分析 43第五章 維修時距選定與維修階層調整 51 5.1失效資料分析 51 5.2選定維修時距 52 5.3維修階層分析 55第六章 結論與建議 58 6.1結論 58 6.2建議 59參考文獻 60 | |
dc.identifier.citation |
1. 台灣鐵路管理局會計處, “93年台鐵統計”, 2004.2. 莊明聰, “以整體後勤支援觀點探討軌道車輛維修制度”, 國立台灣科技大學機械工程學系碩士論文, 2003.3. 沈育樹, “維護管理系統設計與模式分析”, 中原大學工業工程研究所博士論文, 2002.4. 陳國棟, “以平衡計分卡觀點探討台北捷運電聯車維修績效指標”, 元智大學工業工程與管理學系碩士論文, 2003.5. 陳臣乾, “以可靠度為中心的維修在武器系統修護計畫上之應用”, 中正理工學院兵器系統工程研究所碩士論文, 1997.6. 吳崇銘, “武器系統預防性維修整體規劃之探討”, 中正理工學院兵器系統工程研究所碩士論文, 1996.7. 蘇國瑋, “以知識為基礎的故障復原管理機制之發展與應用”, 國立清華大學工葉工程與工程管理學系博士論文, 2000.8. 陳祖光, “以可靠度為中心之維修分析運用於部署服役後系統最佳維修策略之研究”, 國防大學中正理工學院兵器系統工程研究所碩士論文, 2001.9. 陳文彬, “以可靠度觀點來探討海巡署船艇維修之策略”, 國防大學中正理工學院造船工程研究所碩士論文, pp.2, 2003.10. 熊義明, “產品功能測試規劃與壽命推估之研究-以武器系統為例”, 國立高雄第一科技大學機械與自動化工程所碩士論文, pp.52, 2003.11. 鐵路機車車輛檢修規則12. 李順德, “整體後勤支援原理及應用”, 華泰書局, pp.56, 1997.13. 楊尚青, 高一智, 李振忠, “應用維修階層分析(LORA)技術探討國軍戰車砲塔系統之最佳維修模式”, 九十年度國防整體後勤支援年會暨研討會論文集, pp.35, 2001.14. 周光暉, “流線型可靠度中心式維修技術,” 核研季刊, Vol.24, pp.73, 1997.15. 薛家豪, “維修管理與績效評估,” 國立清華大學工業工程與工業管理學系碩士論文, pp.44-48, 1999.16. 林忠漢, “探討可靠度集中維護方法於軌道維護策略之應用-以台北捷運高運量電聯車系統為例,” 國立交通大學運輸科技與管理學系碩士論文, 2005.17. 關季明, “維護度工程與系統妥善度”, 中華民國品質學會, pp.130-142, 2003.18. Blanchard, B. S. and Fabrycky, W. J., “Systems Engineering and Analysis,” Prentice-Hill, Inc., 1998.19. H. Taylor and S. Karlin. “An Introduction To Stochastic Modeling,” Academic Press, 1998.20. Nowlan, F. S., Heap, H., “Reliability-Centered Maintenance,” US Department of Commerce(NTIS), Springfiled, VA, 1978.21. Anderson, Ronald T.; Neri, Lewis, “Reliability-Centered Maintenance Management and Engineering Methods,” Elsevier Science Pub. Co, pp.4, 1990.22. Kennedy, Ross, “Examining the Processes of RCM and TPM,” URL:http://www.plant-maintenance.com/articles/RCMvTPM.shtml23. Rausand, M., “Reliability Centered Maintenance,” Reliability Engineering and Systems Safety, Vol.60, pp.121, 1998.24. Ludwig J. Hollick, Greg N. Nelson, “Rationalizing Scheduled-Maintenance Requirements Using Reliability Centered Maintenance – A Canadian Air Force Perspective,” IEEE Proceedings Annual Reliability and Maintenance Symposium, pp. 11-17, 1995.25. S. Eisinger, U. K. Rakowsky, “Modeling of uncertainties in reliability centered maintenance-a probabilistic approach,” Reliability Engineering and System Safety, Vol.71, pp. 159-164, 2001.26. Bonnie S. Hauge, Donald C. Johnston, “Reliability Centered Maintenance and Risk Assessment,” IEEE Proceedings Annual Reliability and Maintenance Symposium, pp. 36-40, 2001.27. Basim Al-Najjar, Imad Alsyouf, “Selecting the most efficient maintenance approach using fuzzy multiple criteria decision making,” International journal of production economics, Vol.84, pp. 85-100, 2003.28. G. Abdul-Nour, H. Beaudoin, P.Ouellet, R. Rochette, S.Lambert, “A Reliability Based Maintenance Policy; A Case Study,” Computers ind., Vol.35, pp. 591-594, 1998.29. Rommert Dekker, “Applications of maintenance optimization models:a review and analysis,” Reliability Engineering and System Safety, Vol.51, pp. 229-240, 1996.30. Jørn Vatn, Per Hokstad, Lars Bodsberg, “An overall model for maintenance optimization,” Reliability Engineering and System Safety, Vol.51, pp. 241-257, 1996.31. J. Huang, C. R. Miller, O. G. Okogbaa, “Optimal Preventive-Replacement Intervals for the Weibull Life Distribution:Solutions & Applications,” IEEE Proceedings Annual Reliability and Maintenance Symposium, pp. 370-377, 1995.32. Danny I. Cho, Mahmut Parlar, “A survey of maintenance models for multi-units systems,” European Journal of Operational Research, Vol.51, pp.1-23, 1991.33. A. Sittithumwat, F.Soudi, K.Tomsovic, “Optimal allocation of distribution maintenance resources with limited information,” Electric Power Systems Research, Vol.68, pp.208-220, 2004.34. D. J. Bowler, P. L. Primrose, R. Leonard, “Economic evaluation of reliability-centered maintenance(RCM):an electricity transmission industry perspective,” IEE Proc.-Gener. Transm. Distrib., Vol.142, No.1, pp. 9-16, 1995.35. G. F. D’Addio, P. Firpo, S.Savio, “Reliability Centered Maintenance:A Solution to Optimise Mass Transit System Cost Effectiveness,” International Conference on Developments in Mass Transit Systems, Conference Publication No. 243, pp. 211-216, 1998.36. Gian Francesco D’Addio, Stefano Savio, Pierluigi Firpo, “Optimized Reliability Centered Maintenance of Vehicles Electrical Drives for High Speed Railway Applications,” ISIE’97, pp. 555-560, 1997.37. Diego J. Pedregal, Fausto P. García, Felix Schmid, “RCM2 predictive maintenance of railway systems based on unobserved components models ,” Reliability Engineering and System Safety, Vol.83, pp. 103-110, 2004.38. Jesús Carretero, José M. Pérez, Félix García-Carballeira, Alejandro Calderón, Javier Fernández, Jose D. García, Antonio Lozano, Luis Cardona, Norberto Cotaina, Pierre Prete, “Applying RCM in large scale systems:a case study with railway networks,” Reliability Engineering and System Safety, Vol.82, pp. 257-273, 2003.39. Benjamin S. Blanchard, “Logistics Engineering and Management,” pp.18, 1995.40. Joseph G. Monks, “Operations Management Theory and Problems,” pp.547, 1977.41. Pintlon L., Gelder L. F., “Maintenance Management Decision Making,” European Journal of Operation Research, Vol.58, pp.301, 1992.42. K. Hitomi, “Manufacturing Systems Engineering,” pp.156, 1983.43. Elsayed, E. A., “Reliability Analysis,” Addison Wesley, pp.527-537, 1996.44. Blanks, H. S., Tordon, M. J., “Optimum Replacement of Deteriorating and Inadequate Equipment,” Quality and Reliability Engineering International, Vol.2, pp.183-197, 1986. | |
dc.identifier.uri |
https://hdl.handle.net/20.500.14371/32003 | |
dc.language.iso |
中文 | |
dc.relation.alma |
990010314570206772 | |
dc.relation.page |
62 | |
dc.subject.keyword |
可靠度為中心維修 | |
dc.subject.keyword |
軌道車輛 | |
dc.subject.keyword |
維修階層 | |
dc.subject.keyword |
Reliability-Centered Maintenance (RCM) | |
dc.subject.keyword |
railway rolling stock | |
dc.subject.keyword |
level of repair | |
dc.title |
應用可靠度為中心維修方式規劃軌道車輛維修階層之研究-以台鐵電聯車動力系統為例 | zh-TW |
dc.title |
Applying Reliability-Centered Maintenance (RCM) Approach to Repair Level Design for Railway Rolling Stocks - An Example of EMU Power Subsystem of TRA | en |