薄膜電晶體陣列廠機台配置機制之構建
顯示簡易詮釋資料 統計資料| 欄位 | 內容 | 語言 |
|---|---|---|
dc.contributor.advisor |
鍾淑馨 博士 | |
dc.contributor.advisor |
Dr. Shu-Hsing Chung | |
dc.contributor.author |
梁宇帆 | |
dc.contributor.author |
Yu-Fan Liang | |
dc.contributor.college |
管理學院 | |
dc.contributor.committee |
||
dc.contributor.committee |
||
dc.contributor.department |
工業工程與管理系所 | |
dc.contributor.studentid |
9333549 | |
dc.date.NCLavailable |
2007/07/28 | |
dc.date.USTavailable |
2006/07/28 | |
dc.date.issued |
2006 | |
dc.date.issuedROC |
95 | |
dc.date.paperavailable |
立即公開 | |
dc.date.schoolyear |
94 | |
dc.description.abstract |
在TFT-LCD產業之三階段製程中,由於第一階段之薄膜電晶體陣列(TFT Array)段其機台設備十分昂貴,因此,薄膜電晶體陣列廠中機台數量之配置規劃為一個相當重要之長期決策。此外,產品生產週期時間為一項重要之生產績效指標,同時亦為機台規劃時不可或缺之考慮因素。再者,由於TFT-Array廠中玻璃基板體積龐大,須以自動化搬運系統進行物料之運送,若系統之搬運車數配置不當,將導致廠內工件之生產週期時間拉長,因此,不可忽略搬運因素對於生產系統之影響。 有鑑於此,本文首先估算系統所需之合適車數,使生產活動受搬運系統影響而延遲之可能性降低,同時避免不必要之成本浪費。吾人並在考量搬運因素下,依據等候理論方法發展一套適用於TFT-Array廠之生產週期時間估算法則,以便快速地求算生產週期時間。本文所設計之機台配置機制,將根據生產週期時間以及機台購置成本等資訊,運用排序方法進行機台數量之配置規劃,使系統之生產績效得以維持在一定水準之上,同時追求機台購置總成本之最小化,以確保整體之競爭力。 驗證結果顯示,本文所推估之搬運車數,在維持瓶頸資源利用率於預定水準之前提下,可使得系統產出量達成預期目標,且不致造成車輛資源的浪費;在產品生產週期時間估算值與模擬結果相比較之下,平均誤差小於3%;而透過本文模式所求得之機台數量配置,確實可滿足系統要求之生產績效水準。整體而言,本文所發展之模式,具有即時性與有效性,可作為機台規劃決策之參考依據。 | |
dc.description.abstract |
TFT-Array is the first stage among the three-stage manufacturing process of TFT-LCD, which needs quite expensive equipments. Thus, tool allocation for a TFT-Array factory is a significant long-term decision. Besides, product cycle time is one of the major performance measurements, and also an essential consideration of tool allocation. The volume of glasses in the TFT-Array is quite huge, so that if the number of vehicles in automation transportation system is assigned improperly, the product cycle time in the factory will increase. Therefore, the impact of transportation system on the production system should not be ignored. In this study, we first estimate the ideal number of automatic guided vehicle (AGV) for the system to minimize the probability of production delay resulted from the AGV, and to avoid unnecessary transportation cost. Also, we develop a fast cycle time estimation based on Queueing Theory for a TFT-Array factory considering transportation time. Then, we propose tool allocation mechanism, based on the data of the estimated cycle time and cost, to allocate the number of tools by ranking in order to keep the performance level of production system and the minimization of total purchase cost being pursued simultaneously. Simulation experiment reveals that on the premise of keeping the utilization of bottleneck machine at predetermined level, the number of AGV estimated is enough for supporting the achievement of planned target. Compare the estimated cycle time and the simulation result, the average error is less than 3%. And the machine units derived from the tool allocation mechanism can make the production performance truly satisfy the requirements of the system. Consequently, the mechanism proposed in this research is effective and efficient, and can be used as a feasible reference of tool planning. | |
dc.description.abstractopendate |
||
dc.description.degree |
碩士 | |
dc.description.tableofcontents |
摘要 iAbstract ii誌謝 iii目錄 iv圖目錄 vii表目錄..............................................................................................................viii符號一覽表 xi第一章 緒論 11.1 研究背景與動機 11.2 研究目的 21.3 研究範圍與限制 31.4 研究方法與步驟 4第二章 文獻探討 62.1 薄膜電晶體陣列(TFT-Array)段之介紹 62.1.1 薄膜液晶顯示器(TFT-LCD)之製程簡介 62.1.2 薄膜電晶體陣列(TFT-Array)段之製程介紹 72.1.3 薄膜電晶體陣列(TFT-Array)段之特性 92.2 自動化搬運系統 102.2.1 搬運系統之軌道佈置 102.2.2 搬運系統之車數問題 122.3 生產週期時間 122.3.1 生產週期時間之定義 122.3.2 生產週期時間之估算方法 132.4 機台數量備配置問題 172.4.1 確定性分析法 172.4.2 數學分析法 172.4.3 模擬法 212.4.4 混合法 21第三章 模式建構 253.1 問題定義與分析 253.2 整體邏輯與架構 283.3 搬運車數估算模組 303.3.1 搬運系統之最適搬運車數估算 303.4 生產週期時間估算模組 343.4.1 搬運時間之估算 343.4.2 工作站週期時間之估算 413.4.3 產品之生產週期時間 513.5 機台數量配置模組 553.5.1 初始機台數量估算機制 563.5.2 機台數量新增機制 59第四章 實例驗證 694.1 系統環境說明 694.1.1 生產環境資料 694.1.2 生產排程規劃假設 714.2 案例說明 724.2.1 搬運車數估算模組之執行過程 724.2.2 初始機台數量估算機制之執行過程 744.2.3 生產週期時間估算模組之執行過程 764.2.4 機台數量新增機制之執行過程 894.3 模擬驗證 964.3.1 模擬環境說明 964.3.2 搬運車數估算結果之驗證分析 964.3.3 生產績效之評估分析 974.3.4 生產週期時間估算模組之成效分析 994.3.5 機台數量新增機制之成效分析 1014.3.6 不同機台配置下之生產週期時間分析 108第五章 結論與未來研究方向 1105.1 結論 1105.2 未來研究方向 111參考文獻 113附錄 117附錄A 製程資料 117附表B 工作站相關資訊 119附表C 生產週期時間估算與模擬結果 120附表D 生產週期時間估算方法之比較結果 122 | |
dc.identifier.citation |
[1] Bozer, Y. A., and Srinivasan, M. M., “Tandem Configurations for AGV Systems Offer Simplicity and Flexibility,” Industrial Engineering, Vol. 21, No. 2, pp.23-27, 1989.[2] Bretthauer, K. M., “Capacity Planning in Networks of Queues with Manufacturing Applications,” Mathematical Computer Modeling, Vol. 12, No. 12, pp.35-46, 1995.[3] Bretthauer, K. M., “Capacity Planning in Manufacturing and Computer Networks,” European Journals of Operational Research, Vol. 91, pp.386-394, 1996.[4] Chase, R. B., and Aquilano, N. J., Production and Operations Management, Fourth Edition, Mei-Ya, Inc., pp.155-156, 1985.[5] Chung, S. H., and Huang, H. W., “The Block-Based Cycle Time Estimation Algorithm for Wafer Fabrication Factories,” International Journal of Industrial Engineering, Vol. 6, No. 4, pp.307-316, 1999.[6] Connors, D. P., Feigin, G. E., and Yao, D. D., “A Queueing Network Model for Semiconductor Manufacturing,” IEEE Transactions on Semiconductor Manufacturing, Vol. 9, No. 3, pp.412-427, 1996.[7] Conway, R., Maxwell, W., and Miller, L. W., Theory of Scheduling, Addison-Wesley Publishing Company, Inc., 1967.[8] Grewal, N. S., Bruska, A. C., Wulf, T. M., and Robinson, J. K., “Integrating Targeted Cycle-Time Reduction into the Capital Planning Process,” Proceeding of the 1998 Winter Simulation Conference, pp.1005-1010, 1998.[9] Hiller, F. S., and Lieberman, G. J., Introduction to Operations Research, Seventh Edition, McGraw-Hill Publishing Company, 2001.[10] Hood, S., Bermon S., and Barahona, F., “Capacity Planning Under Demand Uncertainty for Semiconductor Manufacturing,” IEEE Transactions on Semiconductor Manufacturing, Vol. 16, No. 2, pp.273-280, 2003.[11] Kocher, R., “Capacity Planning in the Face of Production-Mix Uncertainty,” Proceeding International Symposium on Semiconductor Manufacturing, Santa Clara, California, U.S.A., pp.73-76, 1999.[12] Kramer, Scott S., “Total Cycle Time Management by Operational Elements,” International Semiconductor Manufacturing Science Symposium, pp.17-20, 1989.[13] Leachman, R. C., and Hodges, D. A., “Benchmarking Semiconductor Manufacturing,” IEEE Transactions on Semiconductor Manufacturing, Vol. 9, No. 2, 1996.[14] Little, J. D. C., “A Proof for the Queueing Formula ,” Operation Research, Vol. 9, pp.383-387, 1961.[15] Martin, D. P., “How the Law of Unanticipated Consequences Can Nullify the Theory of Constraint: The Case for Balanced Capacity in A Semiconductor Manufacturing Line,” Semiconductor FABTECH, Seventh Edition, ICG publishing Ltd, pp.29-34, 1998.[16] Maxwell, W. L., and Muckstadt, J. A., “Design of Automated Guided Vehicle Systems”, IIE Transactions, Vol. 14, No. 2, pp.114-124, 1982.[17] Mollaghasemi, M., and Eavns, G. W., “Multicriteria Design of Manufacturing Systems Through Simulation Optimization,” IEEE Transaction on Systems, MAN, and Cybernetics, Vol. 24, No. 9, pp.1407-1411, 1994.[18] Neacy, E., Abt, N., Brown, S., McDavid, M., Robinson, J., Srodes, S., and Stanley, T., “Cost Analysis for A Multiple Product / Multiple Process Factory: Application of SEMATECH's Future Factory Design Methodology,” IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp.212-219, 1993.[19] Northey, P., Southway, N., Cycle Time Management, Productivity Press, 1993.[20] Sinriech, D., Tanchoco, J. M. A., “An Economic Model for Determining AGV Fleet Size”, International Journal of Production Research, Vol. 1, No. 6, pp.1255-1268, 1992.[21] Sinriech, D., Tanchoco, J. M. A., and Herer, Y. T., “The Segmented Bi-directional Single-loop Topology for Material System”, IIE Transaction, Vol. 28, No. 1, pp.40-54, 1996.[22] Swaminathan, J. M., “Tool Capacity planning for Semiconductor Fabrication Facilities Under Demand Uncertainty,” European of Operational Research, Vol. 120, pp.545-558, 2000.[23] Swaminathan, J. M., “Tool Procurement Planning for Wafer Fabrication Facilities: A Scenario-Based Approach,” IIE Trasactions, Vol. 34, pp.145-155, 2002.[24] Wang, T. H., Lin, K. C., and Huang, S. R., “Method of Dynamically Determining Cycle Time of A Working Stage,” IEEE/CPMT International Electronics Manufacturing Technology Symposium, pp.403-407, 1997.[25] Wu, K., “An Examination of Variability and Its Basic Properties for a Factory,” IEEE Transactions on Semiconductor Manufacturing, Vol. 18, No. 1, pp.214-221, 2005.[26] Yoneda, K., Wadration, I., and Haruki, K., ”Job Shop Configuration with Queueing Networks and Simulated Annealing,” IEEE International Conference on System Engineering, pp.407-410, 1992.[27] 吳家駒,「晶圓代工廠機台組合決策」,國立交通大學工業工程與管理學系碩士班,碩士論文,1999。[28] 林時龍,「晶圓廠短期動態機台調整機制」,國立交通大學工業工程與管理學系碩士班,碩士論文,2001。[29] 施盈志,「晶圓製造廠在製品水準之規劃與控制」,國立交通大學工業工程與管理學系碩士班,碩士論文,1996。[30] 郭志榮,「晶圓製造廠考量製程步驟間搬運問題下之生產週期時間估算模式」,國立交通大學工業工程與管理學系碩士班,碩士論文,2002。[31] 陳溪川,「晶圓代工廠產品組合不確定之機台決策機制」,國立交通大學工業工程與管理學系碩士班,碩士論文,2000。[32] 陳蓮春,「什麼是液晶」,建興出版社,2000年6月。[33] 陳志強,「多工單等級下晶圓廠生產週期時間估算模式」,國立交通大學工業工程與管理學系碩士班,碩士論文,2000。[34] 陳亞妮,「薄膜電晶體陣列廠生產規劃系統之構建」,國立交通大學工業工程與管理學系碩士班,碩士論文,2004。[35] 張晏蓉,「不確定環境下半導體機台產能規劃分析」,國立清華大學工業工程與工程管理學系碩士班,碩士論文,2004。[36] 黃宏文,「晶圓製造廠區段基礎式週期時間估算法」,國立交通大學工業工程與管理學系博士班,博士論文,2002。[37] 熊雅意,「晶圓代工廠考慮週期時間限制之機台規劃研究」,國立交通大學工業工程與管理學系博士班,博士論文,2004。[38] 劉睿鈞,「晶圓製造廠機台刪減機制之設計」,國立交通大學工業工程與管理學系碩士班,碩士論文,2003。[39] 蘇昱彰,「新興晶圓代工廠生產規劃與排程系統之構建」,國立交通大學工業工程與管理學系碩士班,碩士論文,1998。[40] 顧洪壽,「光電液晶平面顯示器技術基礎及應用」,新文京開發出版有限公司,2004年3月。 | |
dc.identifier.uri |
https://hdl.handle.net/20.500.14371/32039 | |
dc.language.iso |
中文 | |
dc.relation.alma |
990010204930206772 | |
dc.relation.page |
142 | |
dc.subject.keyword |
薄膜電晶體陣列廠 | |
dc.subject.keyword |
生產週期時間 | |
dc.subject.keyword |
機台組合 | |
dc.subject.keyword |
TFT-Array | |
dc.subject.keyword |
cycle time | |
dc.subject.keyword |
tool allocation | |
dc.title |
薄膜電晶體陣列廠機台配置機制之構建 | zh-TW |
dc.title |
The Design of Tool Allocation Mechanism | en |
dc.type |
Thesis | zh-TW |
檔案
- 354901.pdf (887.8 KB, Adobe PDF)
所屬典藏: 工業工程與管理學系