利用地動訊號探究野外尺度之堰塞壩溢頂潰決過程

Studying overtopping failure process of field-scale dam using seismic signals

檔案

日期

2024

類型

語言

中文

摘要

天然災害事件(如山崩、土石流)的發生往往可能造成堰塞湖的形成,當壩體土石材料受到沖刷、侵蝕或蓄水量持續上升而發生溢流或滲流破壞,潰決水流將會對下游河道兩岸地區保全對象造成嚴重的威脅。因此,若能及早監測壩體的潰決過程,將有助於對於潰決水流進行相關預警工作。傳統方式是使用影像式分析及水文量測來進行監測可能的潰決徵兆,但是堰塞湖往往發生在高山地區,上述監測技術將會有執行上的限制,加上野外尺度下的堰塞湖潰決過程會存在諸多複雜性和不確定性,導致潰決過程的水文歷線及破壞機制等觀測資料缺乏。因此,本研究主要利用微地動訊號來探究大型可控制之潰壩試驗潰決過程,以歸納潰壩試驗的破壞過程與微地動訊號之時頻特徵。此地動訊號監測技術為非接觸式的量測方法,其可在高山地區正常運作,亦可完整監測潰決過程與可能潰決洪水發生之資訊。本研究透過大型可控制潰壩試驗,於壩體兩側(左右河岸)安裝微地動觀測儀,來記錄三軸向地動訊號並分析溢頂事件破壞過程,試驗可分為夯實、非夯實、單壩及單壩加丁壩,上述不同的試驗組合,將會影響壩體的潰決過程與水文特性。因此,本研究蒐集時序攝影分析結果(表面流速、壩體幾何)及水文流量資料將潰決階段分為向源侵蝕(S1)、潰口縱向侵蝕(S2)、潰口橫向侵蝕(S3)與穩定發展階段(S4),並將上述資料與時頻功譜密度值(power spectral density, PSD)時頻特徵進行時序分析的溢頂潰決現象歸納,除了潰決過程以外,在潰壩試驗中同時亦測試不同的壩體夯實作用程度,在潰決機制與地動訊號上的特徵差異。研究結果顯示,由潰壩試驗之近壩體測站的地動訊號特徵來看,夯實壩的訊號頻率範圍較廣泛,約12~80Hz之間,且潰決作用時間約300秒左右;而非夯實壩的訊號範圍頻率較狹窄,約10~70Hz之間,潰決作用時間約400秒左右。潰壩期間流量的分佈在夯實壩中主要呈現單峰流量,峰值約為8cms;非夯實壩的流量分佈呈現雙峰流量,峰值約4cms左右。透過進一步時序分析可得知,當高頻與低頻的能量訊號開始出現擴大的特徵時,則該壩體已溢頂潰決,甚至開始有縱向侵蝕的發展。透過高低頻的PSD能量差距範圍來得知現地潰壩的階段性變化,並且在其差距有擴大的趨勢時即可通知堰塞湖下游的保全對象,以保障其安全。本研究預計整合所有潰壩過程之微地動訊號特徵,並利用2024年4月進行的NCP潰壩試驗與南橫公路新武呂溪的天然堰塞湖事件進行相關特徵驗證,並嘗試評估對於野外天然堰塞湖潰決事件提供可能的的預警時間,由新武呂溪驗證測試成果可知,鄰近堰塞湖的觀測站(水平距離約小於1.5公里)係可以有效監測壩體潰決破壞過程,並配合下游觀測站資料即可估計可能的潰決洪水抵達時間,本研究認為微地動監測技術能對災害防治以及相關減災工作上做出貢獻。
A dam is the natural damming of a river by the geohazards, such as landslides and debris flows. When the dam materials are eroded or washed away due to scour, erosion, and/or an increasing in water level of dam lake, leading dam breach and catastrophic outburst flooding, which affect the downstream area. Therefore, real-time monitoring of dam failure would facilitate relevant early warning message for the impending floods. This study has conducted a series of large-scale controllable dam breach experiments, and installed seismic instruments on both sides of the dam (left and right banks) to record three-components seismic signals and analyze the dam breach process due to overtopping failure. Two types of experiments with distinct compaction (compaction (CP) and non-compaction (NCP)) were conducted, and were further divided into single dam (Dam-I), and single dam plus spur dike (Dam-II). Aforementioned experiment setting can significantly affect the dam breach process and the hydraulic characteristics (e.g., surface flow velocity and discharge) during breaching. Based on time-lapse morphological changes of dam, breach stages are categorized into four stages: retrogressive erosion (S1), vertical cutting (S2), lateral widening (S3), and stable stages (S4). This study first computed the power spectral density (PSD) of breaching seismic signals and further investigated the relations between PSD and flow measurements. The results indicate that based on the seismic signal characteristics observed at stations near the dam during dam breach experiments, the signal range of a compacted dam is broader, approximately between 12 and 80 Hz, with the breach duration around 300 seconds. In contrast, the signal range of a non-compacted dam is narrower, approximately between 10 and 70 Hz, with the breach duration around 400 seconds. During the dam breach, the flow distribution in a compacted dam typically shows a single peak flow, with the peak value around 8 cms, while the flow distribution in a non-compacted dam exhibits a double peak flow, with each peak value around 4 cms. Through further time series analysis, it can be determined that the dam has overtopped and failed, and even started longitudinal erosion when the PSD signals in both high and low frequencies begin to show expanding characteristics. By understanding the stage changes of dam failure on site through the range of energy differences between high and low frequencies, downstream protection targets of the dam can be notified immediately when there is an expanding trend to ensure their safety. Our results aim to integrate all micro-seismic signal characteristics of the dam breach process and use the NCP experiment conducted in April 2024 and the natural dam event at Xinwulu River along the Southern Cross-Island Highway for relevant feature verification. Verification test results from Xinwulu River indicate that observation stations near the dammed lake (within a horizontal distance of approximately 1.5 kilometers) can effectively monitor the dam failure process. Combined with data from downstream observation stations, the potential arrival time of floodwaters resulting from the dam breach can be estimated. This study believes that micro-seismic monitoring technology will contribute significantly to disaster prevention and mitigation efforts.

所屬典藏

土木工程學系
顯示完整詮釋資料 統計資料

引用此條目

侯佑霖 (2024). 利用地動訊號探究野外尺度之堰塞壩溢頂潰決過程. https://thesis.lib.nycu.edu.tw/handle/20.500.14371/3964

BibTeX RIS

引用文字依 APA 第 7 版格式自動產生,使用前請再核對。

分享

永久網址:https://thesis.lib.nycu.edu.tw/handle/20.500.14371/3964