機率警戒水位推估模式之建立 -以基隆河流域為例
顯示簡易詮釋資料 統計資料| 欄位 | 內容 | 語言 |
|---|---|---|
dc.contributor.advisor |
葉克家、吳祥禎 | |
dc.contributor.advisor |
Yeh, Keh-Chia、Wu, Shiang-Jen | |
dc.contributor.author |
楊皓雯 | |
dc.contributor.author |
Yang, Hao-Wen | |
dc.contributor.college |
工學院 | |
dc.contributor.committee |
||
dc.contributor.committee |
||
dc.contributor.department |
土木工程研究所 | |
dc.contributor.studentid |
0451240 | |
dc.date.NCLavailable |
2018/07/06 | |
dc.date.USTavailable |
2018/07/06 | |
dc.date.issued |
2017 | |
dc.date.issuedROC |
106 | |
dc.date.schoolyear |
105 | |
dc.description.abstract |
警戒水位值為台灣中央及地方防救災單位於颱洪豪雨期間,評估緊急應變措施之重要參考,一般依據歷史水位及堤防高配合應用水文水理模式推估洪水上漲速率以決定其警戒值。然而隨著環境變遷,極端降雨事件發生頻率增加,造成水文地文水理特性具有變異性,使得採用水文水理模式所訂定之警戒水位產生不確定性。因此本研究考量水文因子(降雨特性、河口潮位及降雨-逕流模式參數)及地文因子(河道糙度係數)之不確定性下,整合水文水理模式(SOBEK模式)及不確定性及風險分析方法(改良一階二矩法)與羅吉斯迴歸分析,以發展機率警戒水位推估模式。本研究以基隆河為例,採用2008年至2015年間10場颱風事件之水文資料(降雨量、流量、水位及河口潮位)進行模式建置及測試。由模式應用結果可知,所發展的機率警戒水位推估模式可適用於評估不同因子(降雨特性、河口潮位、曼寧n值及SAC-SMA參數)之不確定性條件下,各目標水位站警戒水位值之可靠度,並量化各因子變異性對警戒水位可靠度之影響程度。此外,由模式評估結果亦可知基隆河13個水位站現行一級及二級警戒水位公告值之可靠度達0.93(溢頂風險僅為0.03),顯示現有警戒水位公告值具有相當高之防洪預警可靠度。 | |
dc.description.abstract |
In Taiwan, flood early warning can be issued by Water Resources Agency (WRA) in accordance with the observed water stage exceeding the thresholds (named warning water level) specific river-stage gauges. In general, warning water-levels can be determined by using the hydrological and hydraulic models with historical hydrologic data based on the control elevation of dikes or hydraulic structures. However, climate change and extreme rainstorm events with high occurrence frequency significantly have led to variations in the hydrological and physiographic data in the watersheds which should impact the reliability of hydrological and hydrological models. There exists, accordingly, the uncertainty in resulting thresholds of water levels for flooding and inundation. Therefore, this study aims to develop a probabilistic model for the estimation of warning water levels in the fluvial system by taking into account uncertainties in hydrological and physiographic factors,of which uncertainty factors of interest, hydrological factors include the rainfall characteristics (i.e. rainfall duration, depth and storm pattern) and tide depth and the roughness in the river bed is regarded as the physiographic factor in terms of Manning’s n coefficient. Since the variation of hydrological data should influence the reliability of calibrated parameters of rainfall-runoff models, the parameters of rainfall-runoff models are also treated as the uncertainty factor. In detail, the proposed probabilistic model for the warning water levels is developed by using uncertainty and risk analysis in conjunction with the rainfall-runoff model and river routing model. Noted the in this study, the SOBEK model and SAC-SMA (Sacramento soil moisture accounting) are used in the estimation of runoff and water levels respectively. Eventually, the advanced first-order and second moment (AFOSM) approach is applied in quantifying the reliability of warning water levels attributed to uncertainty factors of interest. The Keelung river watershed is selected as the study area and the hydrological data (i.e. rainfall, discharge and tide depth during typhoon events),which were recorded in associated rainfall and water-stage gauges are adopted in the model development and application. The results from model application indicate that the proposed probabilistic model can not only quantify the reliability of warning water levels at stage stations in the case of combination of variations in the uncertainty factors, but also evaluate the effect of uncertainty factors considered on the warning water levels. In addition, through the proposed probabilistic model, it reveals that issued water levels by WRA at stage gauges along Keelung River are in association with high reliability in early warning and they can enhance the performance of disaster prevention operation. | |
dc.description.abstractopendate |
||
dc.description.degree |
碩士 | |
dc.description.tableofcontents |
摘要 IAbstract III目錄 V表目錄 IX圖目錄 X符號說明 XIV第一章 緒論 11.1 前言 11.2 研究動機與目的 21.3 研究流程 31.4 論文架構 4第二章 文獻回顧 62.1 洪水預警 62.2 不確定性與可靠度分析 11第三章 研究方法 143.1 模式建置架構 143.2不確定性因子之界定 173.3 降雨特性模擬 203.3.1 非常態多變量蒙地卡羅模擬(Non-normal Multivariate Monte Carlo Simulation) 213.4 SOBEK模式介紹 253.4.1 一維渠流模式 253.4.2 降雨逕流模式 263.5 降雨逕流模式之參數率定 323.5.1 參數敏感度分析 373.5.2 模式驗證指標 393.6 警戒水位推估方法 413.7 警戒水位不確定性與風險分析 463.7.1 警戒水位溢頂風險定義 463.7.2 一階二矩法(First-Order Second-Moment method, FOSM) 503.8 羅吉斯迴歸 54第四章 研究區域 564.1 基隆河流域概述 564.1.1 地理位置及地形 564.1.2 水文氣象 574.1.3 水文站概況 584.2 SOBEK模式建置 60第五章 研究結果與討論 625.1 不確定性因子分析與模擬 625.1.1 降雨特性分析與模擬 625.1.2 SAC-SMA參數率定及模擬 685.1.3 河道糙度係數分析與模擬 745.1.4 潮位分析與模擬 765.2 警戒水位模擬值結果與統計分析 785.3不確定性因子對警戒水位模擬值之敏感度分析 855.4機率警戒水位推估模式之建置 915.4.1 警戒水位模擬值與不確定性因子關係式之建立 915.4.2 警戒水位模擬值可靠度之計算 955.5 不確定性因子對警戒水位模擬值可靠度之影響分析 1015.6 警戒水位可靠度計算方程式之建立 1145.7應用範例說明 119第六章 結論與建議 1246.1 結論 1246.2 建議 126參考文獻 127 | |
dc.identifier.citation |
1.Chang, C.H., Yang, J.C. and Tung, Y.K., (1997), “Incorporate marginal distributions in point estimate methods for uncertainty analysis”, J. Hydraulic Engineering. , ASCE, 123(3): 244-251.2.Fang, T.Q., and Tung, Y.K., (1996), “Analysis of wyoming extreme precipitation patterns and their uncertainty for safety evaluation of hydraulic structure”, Technical Report, WWRC-96.5, Wyomin Water Resource Center, Univ. of Wyoming, Laramie, Wyoming.3.Jeuland, M., (2010), “Social discounting of large dams with climate change uncertainty”, Water Alternatives, 3(2): 185-206.4.Kim, J.S., Lee, C.J., Kim, W. and Kim, Y.J., (2010), “Roughness coefficient and its uncertainty in gravel-bed river”, Water Science and Engineering, 2010, 3(2): 217-232.5.Kuo, J.T., Hsu, N.S. and Chiu, S.K., (2006), “Optimization and risk analyses for rule curves of reservoir operation: application to Tien-Hua-Hu Reservoir in Taiwan”, Water Science & Technology, 53(10): 317-325.6.Kuo, J.T., Yen, B.C., Hsu, Y.C. and Lin, H.F., (2007), “Risk analysis for dam overtopping-Feitsui reservoir as a Case Study”, Journal of Hydraulic Engineering, ASCE, 133(8): 955-963.7.Mays, L.W., (1996), “The role of risk analysis in water resources engineering”, Department of Civil and Environmental Engineering Arizona a State University.8.Rackwitz, R. and Fiessler, B., (1978), “Structural reliability under combined random load sequences”, Comput. Struc., 9,489-494.9.Panela, S., (2012), “The color of danger: PAGASA’s new rainfall and flood warning system”, GMA News.10.Stakhiv, E. Z., (2011), “Pragmatic approaches for water management under climate change uncertainty”, Journal of the American Water Resources Association, Vol. 47,(6),pp. 1183–1196.11.Tung, Y.K., (1996), “Uncertainty and reliability analysis”, Chapter 7 in Water Resources Handbook, (ed. by L.W. May s), McGraw-Hill, New York.12.Tung, Y.K., and Mays, L.W., (1981), “Risk models for flood levee design”, Water Resources Research, Vol.17,No.4,pp.833-841.13.Tung, Y.K. and Yen, B.C., (2006), “Hydrosystems engineering reliability assessment and risk analysis”, The McGraw-Hill Companies, Inc.14.Wu, S.J., Chiueh, Y.W., Lien, H.C., and Hsu, C.T., (2015), “Modeling risk analysis for rice production due to agro-climate change in Taiwan”, Paddy and Water Environment, 13(4), 391-404.15.Wu, S.J., Hsu, C.T., Lien, H.C. and Chang, C.H., (2011), “Calibration of conceptual rainfall–runoff model using genetic algorithm integrated with runoff estimation sensitivity to parameters”, Journal of Hydroinformatics. , Vol. 14 Issue 2, p497-511. 15p.16.Wu, S.J., Hsu, C.T., Lien, H.C., and Chang, C.H., (2015), “Modeling the effect of uncertainties in rainfall characteristics on flash flood warning based on rainfall thresholds”, Natural Hazards, 75(2), 1677-1771.17.Wu, S.J., Yang, J.C. and Tung, Y.K., (2011), “Risk analysis for flood-control structure under consideration of uncertainties in design flood”, Natural Hazards, 58:117–140.18.Yeh, K. C., and Tung Y. K., (1993), “Uncertainty and sensitivity analysis of pit-migration model”, J. of Hydraulic Engineering, ASCE, Vol. 119(2), pp 262-283.19.Yen, B. C., and Tung, Y. K., (1993), “Reliability and uncertainty analyses in hydraulic design” , ASCE, pp. 17-34 , New York.20.Yen, et al., (1987), “Stochastic and risk analysis in hydraulic engineering”, Water Resources Pubns.21.吳祥禎(2006),「整合時間尺度之隨機降雨序列模擬機制之發展與應用」,博士論文,國立交通大學土木工程學系。22.杜俊明(1999),「河堤溢流風險之解析」,碩士論文,國立成功大學水利及海洋工程學研究所。23.紀雲曜、 謝正倫 、 康富智(2013),「河道溢堤機率評估模式之研究─EXCEL之應用」,台灣公共工程學刊,第七卷,第一期,第1-9頁。24.美國國家氣象局網站http://www.floodsafety.noaa.gov/watch_warning.shtml25.英國環境署網站http://apps.environment-agency.gov.uk/flood/34978.aspx26.國立台北科技大學(2005),「基隆河整體治理計畫(前期計畫)暨後期治理規劃方案之效益與風險評估」,經濟部水利署水利規劃試驗所。27.國立台灣大學水工試驗所(2002),「基隆河洪水預報模式建置計畫」,經濟部水利署。28.國立交通大學(2001),「台北防洪淡水河警戒水位檢討」,經濟部水資源局。29.國立交通大學防災工程研究中心(2002),「臺北防洪淡水河警戒水位訂定之相關配合工作檢討」,經濟部水利署。30.國立交通大學防災工程研究中心(2007),「影響水利建造物(蓄水建造物除外)功能之風險因子探討與分析程序之建立(1/2)」,經濟部水利署。31.國立交通大學防災工程研究中心(2008),「中央管河川警戒水位檢討及訂定」,經濟部水利署。32.國立交通大學防災工程研究中心(2008),「河川警戒水位訂修參考手冊」,經濟部水利署。33.國立交通大學防災工程研究中心(2008),「影響水利建造物(蓄水建造物除外)功能之風險因子探討與分析程序之建立(2/2)」,經濟部水利署。34.國立交通大學防災與水環境研究中心(2011),「中央管河川與區域排水系統警戒水位站規劃」,經濟部水利署。35.國立交通大學防災與水環境研究中心(2012),「氣候變遷下中央管河川警戒水位站建置之檢討與規劃」,經濟部水利署。36.國立交通大學防災與水環境研究中心(2013),「洪水預報模式參數檢定與警戒水位檢討與訂定」,經濟部水利署。37.國立交通大學防災與水環境研究中心(2015),「系集水理模式庫建置與警戒水位訂定研究(1/2)」,經濟部水利署。38.國立交通大學防災與水環境研究中心(2016),「系集水理模式庫建置與警戒水位訂定研究(2/2)」,經濟部水利署。39.張向寬、欉順忠、賴進松、譚義績(2013),「雨水下水道警戒水位制定評估研究」,土木水利應用研討會論文集。40.張哲豪(1993),「考量非常態分佈資訊於水利系統不確定性分析之研究」,博士論文,國立交通大學土木工程學研究所。41.張哲豪、吳祥禎(2003),「應用不確定性分析於流量延拾取線可靠資料年限決定之研究」,台灣水利,第51卷,第2期,第62-72頁。42.郭季窈(2016),「水庫供水量可靠度推估模式之建立-以石門水庫為例」,碩士論文,國立交通大學土木工程學系。43.曾麒毓(2016),「以可靠度為考量之颱洪期間區排護岸破壞預警架構研擬」,碩士論文,國立交通大學土木工程學系。44.游保杉、陳信彰、楊道昌(1997),「分布型降雨─逕流模式之不確地性分析」,農業工程學報,第43卷,第3期。45.菲律賓大氣地球物理和天文服務管理局網站http://www1.pagasa.dost.gov.ph/46.黃翰林(1996),「河堤溢流之風險可靠度分析」,碩士論文,成功大學水利及海洋工程研究所。47.楊錦釧、湯有光(1992),「水文模式不定性分析報告及其在水工結構之可靠度研究(一)」,行政院農業委員會計畫報告,農委會81農建-12.2-林-05(7)。48.葉克家、楊昇學(2008),「河川警戒水位訂定與洪災減輕」,國家災害防救科技中心災害防救電子報,災害防救科技與知識專欄。49.賴鏡如(2008),「河防構造物功能風險分析架構之研究」,碩士論文,國立交通大學土木工程學系。 | |
dc.identifier.uri |
https://hdl.handle.net/20.500.14371/65639 | |
dc.language.iso |
中文 | |
dc.relation.alma |
990055811210206772 | |
dc.relation.page |
131 | |
dc.subject.keyword |
警戒水位 | |
dc.subject.keyword |
SOBEK | |
dc.subject.keyword |
多變量蒙地卡羅模擬法 | |
dc.subject.keyword |
不確定性與風險分析 | |
dc.subject.keyword |
預警可靠度 | |
dc.subject.keyword |
Warning level | |
dc.subject.keyword |
SOBEK | |
dc.subject.keyword |
Multivariate Monte Carlo Simulation | |
dc.subject.keyword |
Uncertainty and risk analysis | |
dc.subject.keyword |
Early warning reliability | |
dc.title |
機率警戒水位推估模式之建立 -以基隆河流域為例 | zh-TW |
dc.title |
Development of probabilistic warning water level estimation model–A case study of Keelung River watershed | en |
dc.type |
Thesis | zh-TW |
檔案
- 01.pdf (4.19 MB, Adobe PDF)
所屬典藏: 土木工程學系