運用文字探勘方法偵測分析瓶頸機台
A Text Mining Approach for Bottleneck Detection and Analysis in Linear Job Shops
摘要
在生產排程中,零工式排程一直是相當知名且被認為難以求解的一項問題。然而,現實中的製造業其實並不如學術界所假設的零工式排程那般複雜,反而擁有可被觀察出的近似於流線式排程之特徵。故,本篇研究將定義並稱呼這類型之零工式排程問題為「直線式零工產線」,運用此類型問題之特性,以某PCB製造廠之生產資料為例,提出兩個新解題角度:一、引用文字探勘方法,使用N-gram模型切割製令與計算詞頻,以對直線式零工式產線進行分析,並偵測可能之瓶頸所在。二、依據前一階段所分析出來的瓶頸機台片段,分別對原始資料進行該片段之萃取,將其重新視為一流程式排程問題,用整數規劃模型求解最佳派工順序,並視此最佳解為工作間之優先權順序,套用至整體以求得近似解。將多個所選出之可能瓶頸片段求得之不同近似解,相互比較後選擇最優者,以作為最終產出之近似解之啟發式演算法。本次所提出之啟發式演算法將與知名的NEH演算法同時對實際製造業之數據資料進行解題以比較表現。
While job shop is a classical type of scheduling problem known to be hard, manufacturing problems in real industries are not that complex but with features similar to flow shops. Therefore, in this thesis, this type of problems is specifically defined and named as Linear Job Shops. With the linearity features, we present a new approach applied by an ad hoc heuristic. First, a text-mining technique, N-gram modelling, is adopted to analyse the data sets to detect the machines for bottleneck candidates. Second, according to the candidates, the bottleneck data are extracted from the original data sets and solved as flow shops by the mixed integer programming models. Next, the optimal job sequences of bottleneck candidates are transformed into the priorities of jobs for the original problem to produce approximate solutions. Consequently, by comparing the approximate solutions of each candidate, the best one ends up being the final solution. The performance of proposed heuristic algorithm is compared with the well-known NEH algorithm through numerical instances from real production lines. The objective function of our problem is minimum makespan, and re-entrances are allowed. Moreover, this paper also designs a decision support system deploying the proposed solution strategy for conducting manufacturing uses on-site.