高科技廠房無塵室機電工程變更設計問題與處理對策之探討

Exploration and Strategy Development for Design Change Issues of Electrical and Mechanical Installation in High-Tech Clean Room

檔案

全文未公開。

日期

2019

類型

語言

中文

摘要

高科技廠房變更設計時常發生,尤其無塵室工程變更設計相當頻繁,然而科技廠房在無塵室機電工程變更設計方面之文獻不多,因此本研究將在高科技廠房無塵室機電工程變更之問題做歸類分析、探討發生之原因及處理對策。本研究透過文獻回顧、案例分析及德菲法問卷等方式,探討無塵室機電工程承攬商從設計及施工階段之變更設計問題及處理策略,經由分析可知,變更設計原因分類有「設計不完善」、「需求變更」、「施工界面管理」、「生產製程因素」及「發包延遲」五大類別,且變更設計次數的多寡與變更金額成一正向關係,變更次數及金額之重要因素皆為「生產製程因素」及「需求變更」,若科技廠建廠過程能針對上述兩項因素進行控管,將能有效降低無塵室機電工程變更設計之次數與金額。進一步分析其背後原因發現,主要受到高科技廠房為了早日投入生產,建廠作業時程刻意被壓縮造成,且大多是需求變更及生產製程因素而產生之變更設計。高科技廠房變更設計頻繁為其特性,直接影響到工期及成本甚鉅,因此業主的判斷及決策速度,將是影響變更設計之重要關鍵。
Design change issues in high-tech plant construction constantly occur during different phases along a project, especially those for clean room construction. However, there are few documents and studies on design change issues of electrical and mechanical installation when it comes to clean room construction. Therefore, in this study, it aims to classify and analyze the problems of design changes for electrical and mechanical systems installation during the clean room construction, then to focus discussion with regard to causes and countermeasures. This study explores the design changes and countermeasures of electrical and mechanical installation for contractors in clean room projects from design to construction phases through literature review, case study and Modified Delphi Method. Based on results of the analysis, there are five major categories of causes into which design changes fall, including “imperfect design”, “demand changes”, “construction interface management”, “production process” and “delay in contract delivery”. Moreover, the number of time that design changes occur is positively correlated with the amount of money arises from the changes. The most important factors that account for the frequency of changes and the magnitude of changes mainly relate to revised production process and respective demand changes. If the foregoing two factors can be properly controlled during the process of setting up a high-tech plant, the frequency and the scale of design changes will be effectively reduced. Further investigation of the causes behind these issues shows that they are usually caused by deliberate compression of a construction schedule with an ambitious intension to put the high-tech plant into production as early as possible. They are also mostly due to demand changes by revised production process in response to markets. The nature of frequent design changes that comes with high-tech plant projects has a significant impact on both of construction period and project cost. Therefore, the speed of owner’s judgment and a facilitating decision-making process of design changes during construction play key roles to successful projects.
顯示完整詮釋資料 統計資料

引用此條目

張堯哲 (2019). 高科技廠房無塵室機電工程變更設計問題與處理對策之探討. https://thesis.lib.nycu.edu.tw/handle/20.500.14371/72007

BibTeX RIS

引用文字依 APA 第 7 版格式自動產生,使用前請再核對。

分享

永久網址:https://thesis.lib.nycu.edu.tw/handle/20.500.14371/72007