灌溉供水量可靠度推估模式之發展與應用 -以竹東圳為例
Development and application of reliability assessment model for irrigation-water supply - A case study on Zhudong canal
摘要
本研究考量影響灌溉供水之不確定性因子,包括河川入流量、支線閘門操作、水工建造物取水量等因素,並整合蒙地卡羅模擬法與水資源調配模式,模擬各種情境下圳路灌溉水量分配,配合不確定性與風險分析方法,發展灌溉供水量可靠度推估模式,用以量化及評估在水文地文及灌溉操作不確定性條件影響下,圳路灌溉供水之可靠度。灌溉供水量可靠度推估模式包含兩個部分:各支線供水量與不確定性因子相關式及其超越機率計算式,其中灌區支線可供應特定水量之超越機率則定義為灌溉供水量可靠度。
本研究以頭前溪流域竹東圳為例,採用2008年前水利署建置之頭前溪流域RIBASIM架構基礎,配合竹東圳圳路地文及水文資料建置竹東圳水資源調配系統。根據竹東圳現況,將不確定性因子分為水文及灌溉因子,其中水文因子包括上坪堰入流量、寶山水庫取水量、員崠淨水廠取水量,而灌溉因子包括支線閘門最大分水量、各支線計畫灌溉需水量和各支線上游取水量。經由多變量蒙地卡羅模擬衍生出1000組不確定性因子組合,配合RIBASIM模式模擬竹東圳各支線旬灌溉供水量調配結果,並使用不確定性及風險分析方法(AFOSM)及敏感度分析量化其可靠度,最後藉由羅吉斯迴歸分析建立竹東圳各支線灌溉供水量可靠度推估模式。
根據竹東圳各支線灌溉供水量變異係數(Coefficient of variation, CV)計算結果,可將支線區分為三群:第一群為第1支線及第2支線,第二群為第3支線至第7支線,及第三群為第8支線至第14支線。
由模式建置應用結果可知本研究所建置之竹東圳灌溉供水量可靠度推估模式,可合理反映各因子對各支線供水超越機率可能產生的變化趨勢,推估支線能供應不同水量之超越機率,其結果未來可作為評估竹東圳灌溉用水調度之參考。不確定性因子中上坪堰入流量、寶山水庫及員崠淨水廠取水量、支線閘門最大分水量明顯影響竹東圳各支線可取用灌溉水量之可靠度。其中上坪堰入流量、員崠淨水廠取水量、及閘門最大分水量因子對支線灌溉供水超越機率呈現不同程度之正相關趨勢,增加上述因子可提高竹東圳部分支線灌溉供水量之可靠度;反之,當寶山水庫取水量增加時,各支線灌溉供水量超越機率減小(即可靠度下降)。
本研究以頭前溪流域竹東圳為例,採用2008年前水利署建置之頭前溪流域RIBASIM架構基礎,配合竹東圳圳路地文及水文資料建置竹東圳水資源調配系統。根據竹東圳現況,將不確定性因子分為水文及灌溉因子,其中水文因子包括上坪堰入流量、寶山水庫取水量、員崠淨水廠取水量,而灌溉因子包括支線閘門最大分水量、各支線計畫灌溉需水量和各支線上游取水量。經由多變量蒙地卡羅模擬衍生出1000組不確定性因子組合,配合RIBASIM模式模擬竹東圳各支線旬灌溉供水量調配結果,並使用不確定性及風險分析方法(AFOSM)及敏感度分析量化其可靠度,最後藉由羅吉斯迴歸分析建立竹東圳各支線灌溉供水量可靠度推估模式。
根據竹東圳各支線灌溉供水量變異係數(Coefficient of variation, CV)計算結果,可將支線區分為三群:第一群為第1支線及第2支線,第二群為第3支線至第7支線,及第三群為第8支線至第14支線。
由模式建置應用結果可知本研究所建置之竹東圳灌溉供水量可靠度推估模式,可合理反映各因子對各支線供水超越機率可能產生的變化趨勢,推估支線能供應不同水量之超越機率,其結果未來可作為評估竹東圳灌溉用水調度之參考。不確定性因子中上坪堰入流量、寶山水庫及員崠淨水廠取水量、支線閘門最大分水量明顯影響竹東圳各支線可取用灌溉水量之可靠度。其中上坪堰入流量、員崠淨水廠取水量、及閘門最大分水量因子對支線灌溉供水超越機率呈現不同程度之正相關趨勢,增加上述因子可提高竹東圳部分支線灌溉供水量之可靠度;反之,當寶山水庫取水量增加時,各支線灌溉供水量超越機率減小(即可靠度下降)。
This study aims to develop a model for assessing the reliability of resulting irrigation-water supply from a water allocation model by means of uncertainty and risk analysis under consideration of variations in the water demand for irrigation, inflow from river, outflow into hydraulic structures, and opening height of canal gates. The aforementioned reliability is regarded as the probability of supply water exceeding a specific magnitude. In detail, the proposed reliability assessment model consists of two equations, i.e. the relationship between irrigation-water supply and uncertainty factors and calculation of probability of exceeding a water demand (i.e. reliablity), the effect of aforementioned uncertainty factors on the irrigation water at a number of branches within irrigation region of interest should be accordingly quantified and evaluated.
Zhudong canal located within the Touqian river watershed in northern Taiwan are selected as the study area. Regarding the Zhdong Canal, runoff from Shanping Weir is major inflow, and 15 branches in association with the water gates, two reservoirs (i.e. Baoshan and Baoshan II) as well as a water purification plant (i.e. Yuandon) are taken into account in the establishment of water allocation model, RIBASIM model. Additionally, two types of uncertainty factors, hydrological factors (i.e. Inflow from Shanping Weir, outflow into reservoir and water treatment plants) and irrigation features (maximum diverted flow for gate and irrigation-water demand regarding branches) are adopted in the proposed model. After that, 1000 simulations of uncertainty factors are obtained through the Multi-variates Monte Carol method and they are then imported into the RIBASIM to estimate the decade-based (10-day) water supply for entire branches in the Zhudong canal. By doing so, the exceedance probability (i.e. reliability) of simulated irrigation-water supply for entire branches can be computed by using the advanced first order and second moment (AFOSM) approach integrated with the relationship of irrigation-water supply with the uncertainty factors derived by the multi-variate regression analysis. Eventually, the equation of calculating exceedance probability of irrigation-water supply can be obtained through the logistic regression analysis.
In this study, sensitivity analysis for irrigation-water supply is carried out by using the normal regression equation with 1000 simulations of irrigation-water supply at all branches. This reveals that the estimated irrigation-water supply is significantly sensitive to the inflow from Shanping Weir, outflow into Banshan reservoir and Yuandon plant, and the maximum diverted flow. According to the results from the risk analysis, the variations in the above four uncertainty factors markedly impact the reliability of irrigation-water supply for all branches in the Zhudong canal. This can be known that more inflow from Shanping weir can effectively enhance the reliability of irrigation-water supply at entire branches. However, the variation in outflow into the Baoshan reservoir impacts the reliability of irrigation-water supply, especially for the upstream braches from the Baoshan reservoir, i.e. the 8th – 14th branch, of which the reliability of irrigation-water supply declines with more outflow form the Zhudong canal into the Baoshan reservoir. Nonetheless, dissimilar to the Baoshan reservoir, the irrigation-water supply at the 1st-3rd branch is obviously proportional to the outflow into the Yuandon water-treatment plant. This implies that at the 1st-3rd branch, the irrigation water can be supplied with high reliability as a result of outflow into Yuandon water-treatment plant exceeding its demand of interest. Moreover, in accordance with the coefficient of variation (CV) for the irrigation-water supply, 15 irrigation branches within Zhudong canal can be classified into three groups nearby: the 1st -2nd branch (group 1), the 3rd-7th branch (group 2) and the 8th-14th branch (group 3) separated at the the Yuandon water-treatment plant and Baoshan Reservoir, respectively.
In summary, the proposed reliability-assessment model for irrigation-water supply at branches in the Zhudong canal can reasonably describe the change in the reliability of irrigation-water supply at entire branches in the Zhudong canal attributed to uncertainties in hydrological factors and irrigation features. Therefore, it is expected that results from the proposed reliability-assessment model can be taken reference to the regulation of strategy for drought mitigation. In addition, the change in uncertainty factors, including the inflow from the Shanping weir, outflow into Yuandon treatment plant and the maximum diverted flow for each branch obviously and positively influence the exceedance probability distribution of irrigation-water supply. Above three uncertainty factors can increase the reliability of irrigation-water supply by increasing their amount, excluding outflow into Baoshan Reservoir which is inversely related to the exceedance probability of irrigation-water supply (i.e. reliability).
Zhudong canal located within the Touqian river watershed in northern Taiwan are selected as the study area. Regarding the Zhdong Canal, runoff from Shanping Weir is major inflow, and 15 branches in association with the water gates, two reservoirs (i.e. Baoshan and Baoshan II) as well as a water purification plant (i.e. Yuandon) are taken into account in the establishment of water allocation model, RIBASIM model. Additionally, two types of uncertainty factors, hydrological factors (i.e. Inflow from Shanping Weir, outflow into reservoir and water treatment plants) and irrigation features (maximum diverted flow for gate and irrigation-water demand regarding branches) are adopted in the proposed model. After that, 1000 simulations of uncertainty factors are obtained through the Multi-variates Monte Carol method and they are then imported into the RIBASIM to estimate the decade-based (10-day) water supply for entire branches in the Zhudong canal. By doing so, the exceedance probability (i.e. reliability) of simulated irrigation-water supply for entire branches can be computed by using the advanced first order and second moment (AFOSM) approach integrated with the relationship of irrigation-water supply with the uncertainty factors derived by the multi-variate regression analysis. Eventually, the equation of calculating exceedance probability of irrigation-water supply can be obtained through the logistic regression analysis.
In this study, sensitivity analysis for irrigation-water supply is carried out by using the normal regression equation with 1000 simulations of irrigation-water supply at all branches. This reveals that the estimated irrigation-water supply is significantly sensitive to the inflow from Shanping Weir, outflow into Banshan reservoir and Yuandon plant, and the maximum diverted flow. According to the results from the risk analysis, the variations in the above four uncertainty factors markedly impact the reliability of irrigation-water supply for all branches in the Zhudong canal. This can be known that more inflow from Shanping weir can effectively enhance the reliability of irrigation-water supply at entire branches. However, the variation in outflow into the Baoshan reservoir impacts the reliability of irrigation-water supply, especially for the upstream braches from the Baoshan reservoir, i.e. the 8th – 14th branch, of which the reliability of irrigation-water supply declines with more outflow form the Zhudong canal into the Baoshan reservoir. Nonetheless, dissimilar to the Baoshan reservoir, the irrigation-water supply at the 1st-3rd branch is obviously proportional to the outflow into the Yuandon water-treatment plant. This implies that at the 1st-3rd branch, the irrigation water can be supplied with high reliability as a result of outflow into Yuandon water-treatment plant exceeding its demand of interest. Moreover, in accordance with the coefficient of variation (CV) for the irrigation-water supply, 15 irrigation branches within Zhudong canal can be classified into three groups nearby: the 1st -2nd branch (group 1), the 3rd-7th branch (group 2) and the 8th-14th branch (group 3) separated at the the Yuandon water-treatment plant and Baoshan Reservoir, respectively.
In summary, the proposed reliability-assessment model for irrigation-water supply at branches in the Zhudong canal can reasonably describe the change in the reliability of irrigation-water supply at entire branches in the Zhudong canal attributed to uncertainties in hydrological factors and irrigation features. Therefore, it is expected that results from the proposed reliability-assessment model can be taken reference to the regulation of strategy for drought mitigation. In addition, the change in uncertainty factors, including the inflow from the Shanping weir, outflow into Yuandon treatment plant and the maximum diverted flow for each branch obviously and positively influence the exceedance probability distribution of irrigation-water supply. Above three uncertainty factors can increase the reliability of irrigation-water supply by increasing their amount, excluding outflow into Baoshan Reservoir which is inversely related to the exceedance probability of irrigation-water supply (i.e. reliability).