公共污水處理廠擴建工程分包類型對成本超支原因之探討

Causes of Cost Overruns of Subcontracting Types for Public Sewage Treatment Plant Expansion Construction Projects

檔案

全文未公開。

日期

2021

類型

語言

中文

摘要

自民國 90 年代以來,政府積極推動傳統產業升級,推動發展十大新興工業 為主的高科技產業政策,期望作為我國工業發展之主力,於此同時,為避免高 科技產業產生之環境污染物破壞環境,近年來環保法規逐年修正、日益嚴峻, 盼可取得經濟發展與環境保護之間的平衡,但礙於目前國內污水處理廠老舊, 大都已無法滿足現今處理量能且效率不佳,促使政府單位積極推動污水廠擴建 工程,並希冀在不影響日常營運效能前提下,將擴建工程如期、如質、如度地 完成。然而,在營建管理實務執行上,卻多是不如預期,係因工程得標之承攬 商分包類型大都採勞務、設備及材料(非採系統分包),致使工程品質及工期不 易管控,另一方面,工程預算管理不當,致使成本超支情況亦時有所見。為此, 本研究首要透過 3 起國內污水處理廠擴建工程之竣工案例,研析其工程分包方 式與成本超支情形,進而歸納問卷問題,並進一步進行問卷調查,藉以確立研 究成果之客觀性,其研究成果共包括(1)建立分包類型之決策程序;(2)建立污水 廠擴建工程成本超支之特性要因;(3)統計工程成本超支的關鍵因素及(4)建立改 善成本超支對策等項目。經由問卷調查結果顯示,共 84%業界專家認同本研究 成果,有助於提供工程承攬商之分包決策者參考,並得以較客觀且具邏輯的執 行分包決策,促使提升國內污水處理廠擴建工程之營建管理品質。
The Taiwanese government has actively upgraded traditional industries since the 2000s. Specifically, high tech industry policies have been carried out to promote the Ten New Industries as the major force of Taiwanese industrial development. To prevent environmental destruction by the pollutants from high tech industries, environmental regulations have been revised and enforced at an increasing magnitude to maintain the balance between economic development and environmental protection. Because outdated sewage treatment plants have prevented efficient and effective sewage treatment, the government has actively promoted sewage treatment plant expansion, aiming to complete the expansion in a timely, high-quality manner without affecting the daily operation of the plants. However, few expansion projects have been satisfactorily conducted in practice. This is because most of the contractors undertaking the projects have adopted labor, equipment, and material subcontracting rather than systematic subcontracting, rendering project quality and period management difficult. Moreover, inappropriate project budget management has led to frequent cost overruns. Therefore, this study investigated the subcontracting methods involved and cost overruns in three sewage treatment plant expansion projects in Taiwan. A questionnaire was designed and administered accordingly for objective research results, which involved the following procedures: (1) establish the decision-making model of each type of subcontracts; (2) determine the characteristics and factors of cost overruns in sewage treatment plant expansion projects; (3) statistically analyze the key factors to project cost overruns; (4) formulate countermeasures to reduce cost overruns. The questionnaire results indicated that 84% of the industrial experts approved the results of this study, which provide a key reference to project contractors for subcontract decision-making, enabling them to make objective and logical subcontract decisions to improve the quality of sewage treatment plant expansion project management in Taiwan.
顯示完整詮釋資料 統計資料

引用此條目

秦嘉君 (2021). 公共污水處理廠擴建工程分包類型對成本超支原因之探討. https://thesis.lib.nycu.edu.tw/handle/20.500.14371/77702

BibTeX RIS

引用文字依 APA 第 7 版格式自動產生,使用前請再核對。

分享

永久網址:https://thesis.lib.nycu.edu.tw/handle/20.500.14371/77702