匝道儀控對匯流區段容量之影響
顯示簡易詮釋資料 統計資料| 欄位 | 內容 | 語言 |
|---|---|---|
dc.contributor.advisor |
黃家耀 | |
dc.contributor.advisor |
Wong, Ka-Io | |
dc.contributor.author |
陳威瑜 | |
dc.contributor.author |
Chen, Wei-Yu | |
dc.contributor.college |
管理學院 | |
dc.contributor.committee |
邱裕鈞 | |
dc.contributor.committee |
胡守任 | |
dc.contributor.committee |
Chiou, Yu-Chiun | |
dc.contributor.committee |
Hu, Shou-Ren | |
dc.contributor.department |
運輸與物流管理學系 | |
dc.contributor.studentid |
0853618 | |
dc.date.NCLavailable |
2022/08/31 | |
dc.date.USTavailable |
2022/08/31 | |
dc.date.issued |
2021 | |
dc.date.issuedROC |
110 | |
dc.date.paperavailable |
立即公開 | |
dc.date.schoolyear |
109 | |
dc.description.abstract |
匝道儀控為高速公路交通管理手段最有效的措施,透過安裝於進口匝道上的號誌,控制由匝道匯入高速公路主線的車流量,以維持主線車流順暢運作,避免主線進入車流崩潰(traffic breakdown)的現象。匝道儀控技術已廣泛實施於國內之高速公路,但高速公路仍常常發生車流壅塞之情況,因此可進一步檢視目前國內匝道儀控的實施方式對高速公路運作績效的改善程度。 本研究的目的是要探討匝道儀控對高速公路匯流區瓶頸路段之運作績效所帶來的影響,因匝道儀控的效果與匝道儀控策略、實施方式、使用時機等有關,本研究蒐集國內匝道儀控及偵測器資料,並提出高速公路在發生壅塞情況下之運作績效的評估方式,包括有無儀控情況下之過渡時間、平均速率、平均流率、最大流率等,提出假說檢定檢視在不同地點、不同壅塞時段下匝道儀控對主線車流之影響。研究結果顯示,匝道儀控對於平均流率及平均紓解流率有顯著改善,但對於過渡時間及平均速率之改善不顯著。匝道儀控若能成功避免壅塞發生,其車流崩潰前最大流率會顯著提升;然而若無法避免壅塞發生、或壅塞發生後匝道儀控才啟動之情況,對容量之提升則較不顯著。另外,本研究使用隨機容量分析方法,建立車流崩潰與最大流率之機率模式,發現在大部分情況下,開啟匝道儀控後,容量均有提升,但亦有發現發生壅塞後才啟動匝道儀控的情況。本研究之分析結果可供相關交通管理單位參考,作為精進國內匝道儀控的實施方式,讓高速公路的車輛運行更有效率。 | |
dc.description.abstract |
Ramp metering is the most effective measure for freeway traffic management. The flow from the ramp to the mainline is controlled through the traffic light installed on-ramp to maintain the operation of the mainline and avoid the mainline from entering traffic breakdown. Ramp metering technology has been widely implemented on freeways in Taiwan, but freeways still often have traffic congestion. Therefore, it is necessary to examine the current implementation of ramp metering and the degree of improvement in freeway operation performance. This research aims to explore the impact of ramp metering on the operating performance of the bottleneck section of freeway merge areas. Because the effect of ramp metering is related to ramp metering strategies, implementation methods, and timing of use. The study collects history metering rate and vehicle detector data and evaluates performance with or without ramp metering to mainline through the transition period, average speed, average flow, and maximum flow rate. After collecting these parameters, we propose a hypothesis method to examine different locations and different periods of congestion with or without ramp metering. Our results show that the improvement to average flow and average discharge flow are significant, whereas the improvement of transition time and average speed are not significant. If ramp metering can successfully avoid the occurrence of congestion, the maximum flow rate before the traffic breakdown will be significantly increased. However, it has also been found that ramp metering can’t avoid the occurrence of traffic congestion, or the ramp metering is activated after the congestion occurs, which can’t increase capacity significantly. In addition, the study uses the stochastic capacity analysis method to explore whether the capacities of different congestion periods are affected by the ramp metering strategy. It is found that the capacity are generally improved with ramp metering. But in some cases it is found that ramp metering is implemented after traffic breakdown, and thus the capacity decreases. The results of this study can be helpful to the traffic operators for improvement the operational efficiency of our freeway system. | |
dc.description.abstractopendate |
||
dc.description.degree |
碩士 | |
dc.description.tableofcontents |
摘要 iAbstract ii目錄 iv圖目錄 vi表目錄 vii第一章 緒論 11.1 研究背景與動機 11.2 研究目的 31.3 研究範圍 41.4 研究流程 5第二章 文獻回顧 72.1 容量分析 72.2 匝道儀控 92.2.1 國外匝道儀控策略 92.2.2 國內匝道儀控策略 152.3 匝道儀控對匯流區段容量之影響 182.4 小結 21第三章 研究方法 233.1 車流崩潰辨別方式 233.2 匝道儀控實施成效 243.3 隨機容量分析方法 30第四章 資料蒐集分析 324.1 調查地點篩選 324.2 匝道儀控率的資料取得及分析 35第五章 統計檢定推論與容量分析 385.1 匝道儀控有效性檢核 385.1.1 相關參數之擷取 385.1.2 匝道儀控有效性之假說檢定 415.2 匝道儀控對匯流影響區容量的估算 555.2.1 隨機容量分析方法之比較 565.2.2 壅塞時段與匝道儀控情況組合下之隨機容量分布 565.3 討論與小結 655.3.1 討論 655.3.2 小結 69第六章 結論與建議 706.1 結論 706.2 建議 71參考文獻 72附表 75附表一 國道3號北上中和交流道2019年歷史儀控率分布次數 75附表二 國道3號南下龍潭交流道2019年歷史儀控率分布次數 76附表三 國道1號北上竹北交流道2019年歷史儀控率分布次數 77附表四 國道1號北上新竹A交流道2019年歷史儀控率分布次數 78附表五 國道1號南下新竹B交流道2019年歷史儀控率分布次數 79附表六 平日上午匝道儀控有效性之參數 80附表七 平日下午匝道儀控有效性之參數 81附表八 例假日匝道儀控有效性之參數 82附表九 國定假日匝道儀控有效性之參數 83 | |
dc.identifier.citation |
1. Arnold, E. D. (1998). Ramp metering: a review of the literature (No. VTRC 99-TAR5). Virginia Transportation Research Council.2. Asgharzadeh, M., & Kondyli, A. (2020). Effect of Geometry and Control on the Probability of Breakdown and Capacity at Freeway Merges. Journal of Transportation Engineering, Part A: Systems, 146(7), 04020055.3. Brilon, W., Geistefeldt, J., and Regler, M. (2005, July). Reliability of freeway traffic flow: a stochastic concept of capacity. In Proceedings of the 16th International symposium on transportation and traffic theory (Vol. 125143). College Park Maryland.4. Cassidy, M. J., & Rudjanakanoknad, J. (2005). Increasing the capacity of an isolated merge by metering its on-ramp. Transportation Research Part B: Methodological, 39(10), 896-913.5. Chaudhary, N. A., Tian, Z., Messer, C. J., and Chu, C. L. (2004). Ramp metering algorithms and approaches for Texas. Texas Transportation Institute Technical Report.6. Elefteriadou, L. (2014). An introduction to traffic flow theory (Vol. 84). New York: Springer.7. Jacobson, L., Stribiak, J., Nelson, L., and Sallman, D. (2006). Ramp management and control handbook (No. FHWA-HOP-06-001; NTIS-PB2006114641). United States. Federal Highway Administration.8. Kondyli, A., Elefteriadou, L., Brilon, W., Hall, F. L., Persaud, B., and Washburn, S. (2013). Development and evaluation of methods for constructing breakdown probability models. Journal of transportation engineering, 139(9), 931-940.9. Kondyli, A., Gubbala, P., & Elefteriadou, L. (2016). The contribution of ramp demand in the capacity of merge bottleneck locations. Transportation Research Procedia, 15, 346-355.10. May, A. D. (1964). Experimentation with manual and automatic ramp control. Highway research record, (59).11. Mizuta, A., Roberts, K., Jacobsen, L., Thompson, N., and Colyar, J. (2014). Ramp Metering: A Proven, Cost-Effective Operational Strategy: A Primer (No. FHWA-HOP-14-020). United States. Federal Highway Administration.12. Modi, V., Kondyli, A., Washburn, S. S., and McLeod, D. S. (2014). Freeway capacity estimation method for planning applications. Journal of Transportation Engineering, 140(9), 05014004.13. Persaud, B., Yagar, S., Tsui, D., and Look, H. (2001). Breakdown-related capacity for freeway with ramp metering. Transportation Research Record, 1748(1), 110-115.14. Roess, R. P., and Prassas, E. S. (2014). The highway capacity manual: a conceptual and research history.15. Shehada, M. K., & Kondyli, A. (2019). Evaluation of ramp metering impacts on travel time reliability and traffic operations through simulation. Journal of Advanced Transportation, 2019.16. Shen, J., Li, W., Qiu, F., & Zheng, S. (2015). Capacity of freeway merge areas with different on-ramp traffic flow. Promet-Traffic&Transportation, 27(3), 227-235.17. Zechin, D., Caleffi, F., and Cybis, H. B. B. (2020). Influence of Rain on Highway Breakdown Probability. Transportation Research Record, 0361198120919754.18. Zhang, L., and Levinson, D. (2010). Ramp metering and freeway bottleneck capacity. Transportation Research Part A: Policy and Practice, 44(4), 218-235.19. 交通部(2019),公路路線設計規範,交通部。20. 交通部高速公路局(2020),高速公路交通工程手冊(標誌標線篇),交通部高速公路局。21. 李怡穎(2013),高速公路整合控制之啟動時機研究,國立交通大學,碩士論文。22. 李怡穎(2016),高速公路上匝道儀控策略模擬與分析,中華顧問工程司,研發計畫成果報告。23. 李維珊(2002),連鎖式即時匝道儀控方法論研究,國立臺灣大學,碩士論文。24. 陳一昌、黃運貴、朱珮芸(2004),高速公路匝道儀控智慧化之研究,交通部運輸研究所。25. 黃家耀、林貴璽、廖晉毅、溫雲晨、陳威瑜(2019),高快速公路匝道分匯流區容量及服務水準分析之研究(1/3)-獨立進出口分匯流區,交通部運輸研究所委託計畫。26. 廖晉毅(2020),高速公路入口匝道匯流區之隨機容量分析,國立交通大學,碩士論文。 | |
dc.identifier.uri |
https://hdl.handle.net/20.500.14371/77950 | |
dc.language.iso |
中文 | |
dc.relation.alma |
991003683697506772 | |
dc.relation.page |
83 | |
dc.subject.keyword |
高速公路 | |
dc.subject.keyword |
匝道匯流區段 | |
dc.subject.keyword |
匝道儀控 | |
dc.subject.keyword |
車流崩潰 | |
dc.subject.keyword |
隨機容量分析 | |
dc.subject.keyword |
Freeway | |
dc.subject.keyword |
Merge locations | |
dc.subject.keyword |
Ramp metering | |
dc.subject.keyword |
Traffic breakdown | |
dc.subject.keyword |
Stochastic capacity analysis | |
dc.title |
匝道儀控對匯流區段容量之影響 | zh-TW |
dc.title |
The Impact of Ramp Metering on the Capacity of Freeway Merge Locations | en |
dc.type |
Thesis | zh-TW |
檔案
- 01.pdf (1.75 MB, Adobe PDF)
所屬典藏: 運輸與物流管理學系