區間用電總量限制下平行機台的排程
On parallel dedicated machines scheduling under energy consumption limit
摘要
本論文主要為探討平行機台排程結合區間用電總量限制的問題。製造業相關的工廠需要消耗大量的電力,故電力公司都會跟工廠簽訂合約,在合約中會固定週期區間中最大的用電量做限制;因此有效使用電力對工廠而言是一個重要的議題;論文的目標就是在不違反能量限制下,將所有機台上的工作於最短時間完成。
在本研究中,我們針對這個問題首先提出三個整數規劃模型,再來提出螞蟻演算法並使用local search進行改善;另外,我們提出了兩個近似演算法當作整數規劃模型的上界。最後實驗部分會將這些方法的結果進行比較。
在本研究中,我們針對這個問題首先提出三個整數規劃模型,再來提出螞蟻演算法並使用local search進行改善;另外,我們提出了兩個近似演算法當作整數規劃模型的上界。最後實驗部分會將這些方法的結果進行比較。
This thesis discusses the integration of the energy consumption into the problem of scheduling non-preemptive jobs on parallel dedicated machines. The thesis is motivated by the manufacturing companies which consume large amounts of electricity. Generally, the companies sign the contract with an electric utility and the electric utility indicates the maximum energy consumption for periodically repeating fixed metering interval. Optimizing the utilization of the energy is an important issue to the company. The thesis aims to minimize the makespan and does not violate the maximum energy consumption limit in every interval.
In this study, we first proposed three mixed-integer linear programming model. Then we proposed ant colony optimization algorithm to solve the problem in short time. In addition, we proposed two heuristics algorithms as the upper bound of integer programming model. The computational results show that the comparison between the proposed model, algorithm and the constraint programming model, mixed-integer linear programming models inspired by the existing literature.
In this study, we first proposed three mixed-integer linear programming model. Then we proposed ant colony optimization algorithm to solve the problem in short time. In addition, we proposed two heuristics algorithms as the upper bound of integer programming model. The computational results show that the comparison between the proposed model, algorithm and the constraint programming model, mixed-integer linear programming models inspired by the existing literature.