清水混凝土做為建築物裝飾手法日漸增加,而所謂 <清水> 混凝土澆灌於不同模板的樣式並拆卸模板後,表面不會再作任何粉飾或裝修,讓混凝土自然呈現出原始的模板質感,此質感可為建築物外牆之一,但隨著外形不斷推層出新,施工的難度也隨之增加。
本研究藉由風險評估探討清水混凝土建築工程所面臨的風險,並提出高風險作業之管理規範,期許降低國內清水混凝土工程勞工安全事故發生率,讓工程人員及安全人員能有個系統化的依循,善用專業能力並正確現場改善方法。
本研究分析結果顯示,依據管理規範執行現場安全監督查核制度,「高風險項目」確實有下降之趨勢,建議建築工程初期即規劃、建立風險評估及管理規範並搭配現場執行逐步完善,可彌補事後補救的現況作法。
本研究藉由風險評估探討清水混凝土建築工程所面臨的風險,並提出高風險作業之管理規範,期許降低國內清水混凝土工程勞工安全事故發生率,讓工程人員及安全人員能有個系統化的依循,善用專業能力並正確現場改善方法。
本研究分析結果顯示,依據管理規範執行現場安全監督查核制度,「高風險項目」確實有下降之趨勢,建議建築工程初期即規劃、建立風險評估及管理規範並搭配現場執行逐步完善,可彌補事後補救的現況作法。
Exposed concrete is increasingly used as a building decoration technique. The so-called " Exposed " means that after concrete is poured into different formwork styles and the formwork is removed, the surface will not be repainted or decorated, but the concrete naturally presents the original formwork Texture, this texture can be one of the exterior walls of a building, but as the shape continues to be developed, the difficulty of construction also increases.
This research uses risk assessment to explore the risks faced by Exposed concrete construction projects, review them, and propose improvement suggestions, solutions and management plans. It is hoped that the rate of labor safety accidents in domestic clear-water mold projects will be reduced, so that engineers and security personnel can have a better life. Follow systematically, make good use of professional ability and correct on-site improvement methods.
The analysis results of this research show that since 107/10, the on-site safety supervision and inspection system has been implemented, and the "high-risk projects" have indeed been on the decline. It is recommended that the construction project should be planned or established in the early stage of risk assessment and management standards and gradually coordinated with the on-site implementation results. Perfect, make up for the situation of remedial afterwards.
This research uses risk assessment to explore the risks faced by Exposed concrete construction projects, review them, and propose improvement suggestions, solutions and management plans. It is hoped that the rate of labor safety accidents in domestic clear-water mold projects will be reduced, so that engineers and security personnel can have a better life. Follow systematically, make good use of professional ability and correct on-site improvement methods.
The analysis results of this research show that since 107/10, the on-site safety supervision and inspection system has been implemented, and the "high-risk projects" have indeed been on the decline. It is recommended that the construction project should be planned or established in the early stage of risk assessment and management standards and gradually coordinated with the on-site implementation results. Perfect, make up for the situation of remedial afterwards.