捷運高架車站水電預埋管工程施工設計圖繪製探討 -以三鶯捷運工程為例
A Discussion on Construction Design Drawing of MRT Elevated Station Electromechanical Pre-Buried Pipe Engineering - A Case Study of Sanying Line MRT Project
摘要
To adhere to the aesthetic design principles of architects, the MRT construction often prohibits exposed visible pipes in public areas. Therefore, many systems require the installation of conduits in advance. To address this, the MRT Bureau has developed a set of SEM interface drawings to provide buried system requirements for on-site construction personnel. However, the current specifications for SEM drawings in the MRT industry are not comprehensive enough, resulting in drawings produced by design units failing to meet the needs of construction personnel, thereby reducing the effectiveness of the drawings.
This study focuses on the pre-embedded conduit project at the Sanying Line MRT and aims to establish a complete process for drawing pre-embedded conduit construction plans. Based on the requirements of the conduit project and feedback from the Sanying Line MRT construction unit, this study plans the information that needs to be presented in the drawings. It also incorporates detailed construction drawings and enlarged drawings of specific areas that reflect the on-site construction conditions, thereby enhancing the practicality of the drawings. This helps reduce the risk of missing tasks and rework for construction personnel, while also speeding up the drawing process for design personnel, shortening the time required for drawing design and submission, and ultimately improving project efficiency.
This study focuses on the pre-embedded conduit project at the Sanying Line MRT and aims to establish a complete process for drawing pre-embedded conduit construction plans. Based on the requirements of the conduit project and feedback from the Sanying Line MRT construction unit, this study plans the information that needs to be presented in the drawings. It also incorporates detailed construction drawings and enlarged drawings of specific areas that reflect the on-site construction conditions, thereby enhancing the practicality of the drawings. This helps reduce the risk of missing tasks and rework for construction personnel, while also speeding up the drawing process for design personnel, shortening the time required for drawing design and submission, and ultimately improving project efficiency.
為因應建築師美觀設計原則,捷運工程在公共區域常不可裸露明管,許多系統須先行預埋管路,為此捷運局發展了一套結構機電界面圖說(Structure,Electric and Mechanic,簡稱SEM),為現場施工人員提供系統的埋設需求;但目前SEM圖說的捷運規範不夠完善,造成設計單位繪製的圖說無法達到現場施作人員的使用需求,降低了圖說的效用。
本研究主要探討三鶯捷運高架車站預埋管工程,定義一套完整的預埋管施工圖繪製流程;依據預埋管工程需求以及三鶯捷運施工單位的意見回饋,規劃圖說所需呈現的資訊,並納入符合現場施作狀況的施工詳圖及局部區域放大圖,提升圖說實用性。替施作人員降低遺漏工項的隱憂、減少重工機率,也能加快設計人員繪製圖說的時間,縮短圖說設計和送審的工時,達到提高工程效率的目的。
本研究主要探討三鶯捷運高架車站預埋管工程,定義一套完整的預埋管施工圖繪製流程;依據預埋管工程需求以及三鶯捷運施工單位的意見回饋,規劃圖說所需呈現的資訊,並納入符合現場施作狀況的施工詳圖及局部區域放大圖,提升圖說實用性。替施作人員降低遺漏工項的隱憂、減少重工機率,也能加快設計人員繪製圖說的時間,縮短圖說設計和送審的工時,達到提高工程效率的目的。