雙機流線排程模式下權重延遲懲罰之最小化
Two-machine Flow Shop Scheduling for Minimizing Total Weighted Tardiness Penalty
摘要
在現代製造業中,生產排程的彈性與交期準確性已成為企業維持競爭力的重要因素。當生產過程中出現品質異常或設備故障時,產品往往需要重工,導致原有排程被打亂,必須即時重新安排工件順序,以避免出貨延遲與罰款產生。本研究針對雙機台流程式生產系統,考慮重工工件可能僅需單機加工的實際情境,提出兩種創新排程方法:一為結合分支策略的樹狀搜尋演算法(HTS),另一為基於Johnson法則並結合序列交換的改良型啟發式演算法(SHA)。以最小化加權總遲交罰款為目標,建立兩個數學模型並設計對應的演算法,並以不同工件數據進行實驗驗證。實驗結果顯示,所提出的演算法在總遲交罰款方面,平均較人工PMC排程法改善約60%,最大延遲天數亦顯著降低,且計算效率優於傳統方法。研究成果可應用於實際生產現場的異常排程即時調度,有助於提升企業生產線的應變能力與整體營運效率。
In modern manufacturing, on-time delivery and flexible scheduling are key to competitiveness. When quality issues or equipment failures occur, rework often disrupts the original schedule, requiring prompt rescheduling to avoid shipment delays and penalties. The study proposes solutions in a two-machine flow shop setting, considering cases where reworked jobs may only require single-machine processing. The objective is to minimize the weighted total tardiness. Two scheduling methods are proposed: a Heuristic-guided Tree Search (HTS) that uses a branching strategy, and an improved Swap-based Heuristic Algorithm (SHA) based on Johnson’s Rule with sequence swapping. The both mathematical models and their corresponding heuristic algorithms were tested on datasets with varying job sizes. Results show the proposed methods outperform the manual PMC scheduling method, reducing total tardiness penalties by an average of 60% and significantly improving scheduling efficiency. These methods are applicable to real-time rescheduling in abnormal production scenarios and can improve operational performance in practical manufacturing environments.