應用多目標混合整數規劃於分批下料之問題研究: 以 U 公司為例
Application of Multi-Objective Mixed Integer Programming to Lot-Splitting Problem: A Case Study of U Company
摘要
隨著AI科技快速發展,帶動ABF載板訂單需求的大幅成長,導致個案公司的預測需求會造成部分製程產能負荷高達100%以上,目前主要仰賴人工與Excel進行生產規劃,缺乏系統化的工具,提供分批下料的最佳決策。本研究以國內ABF載板製造產業為研究對象,由於個案公司生產的產品多達上百種,生產週期普遍較長,以及多項生產限制條件,面臨複雜性高且受下料與出貨之間跨生產週期的實務問題。
本研究透過文獻探討與問題定義,建立混合整數規劃分批下料模型,以月預測需求作為規劃每日下料決策之基礎,並納入產品生產週期、最小批量、多項瓶頸製程產能及外包等限制條件。為了分析不同決策偏好與下料量控管對指標的影響,本研究透過調整多目標函數之權重與新增下料限制條件,以模擬不同決策情境,並利用Python與 Gurobi Optimizer 進行求解。研究結果顯示,透過適當的下料平準化,可有效降低滿足需求所需的生產天數與外包依賴程度,同時維持良好的產能利用率。研究成果可作為ABF載板製造業進行生產規劃與分批下料決策的參考依據。
本研究透過文獻探討與問題定義,建立混合整數規劃分批下料模型,以月預測需求作為規劃每日下料決策之基礎,並納入產品生產週期、最小批量、多項瓶頸製程產能及外包等限制條件。為了分析不同決策偏好與下料量控管對指標的影響,本研究透過調整多目標函數之權重與新增下料限制條件,以模擬不同決策情境,並利用Python與 Gurobi Optimizer 進行求解。研究結果顯示,透過適當的下料平準化,可有效降低滿足需求所需的生產天數與外包依賴程度,同時維持良好的產能利用率。研究成果可作為ABF載板製造業進行生產規劃與分批下料決策的參考依據。
With the rapid development of artificial intelligence (AI), demand for ABF substrates has grown significantly, resulting in capacity utilization exceeding 100% in certain processes at the case company. Currently, production scheduling is primarily performed through manual planning and Excel-based tools, lacking a systematic approach for determining optimal lot-splitting decisions. This study focuses on the ABF substrate manufacturing industry in Taiwan. Due to the large number of product types, long production lead times, and multiple production constraints, the case company faces a complex planning problem involving cross-period relationships between lot release and product shipment.
Based on a literature review and problem definition, this study develops a mixed-integer programming model for lot-splitting scheduling. Monthly forecast demand is used as the basis for daily lot release decisions, while production lead times, minimum lot sizes, bottleneck capacity constraints, and outsourcing requirements are incorporated into the model. To evaluate the impacts of different managerial preferences and lot release control policies, multiple planning scenarios are generated by adjusting the weights of the multi-objective function and introducing additional lot release constraints. The model is implemented in Python and solved using Gurobi Optimizer. The results indicate that appropriate lot release smoothing can reduce the number of production days required to satisfy demand and decrease dependence on outsourcing while maintaining high capacity utilization. The proposed approach provides a practical decision-support tool for production planning and lot-splitting scheduling in the ABF substrate manufacturing industry.
Based on a literature review and problem definition, this study develops a mixed-integer programming model for lot-splitting scheduling. Monthly forecast demand is used as the basis for daily lot release decisions, while production lead times, minimum lot sizes, bottleneck capacity constraints, and outsourcing requirements are incorporated into the model. To evaluate the impacts of different managerial preferences and lot release control policies, multiple planning scenarios are generated by adjusting the weights of the multi-objective function and introducing additional lot release constraints. The model is implemented in Python and solved using Gurobi Optimizer. The results indicate that appropriate lot release smoothing can reduce the number of production days required to satisfy demand and decrease dependence on outsourcing while maintaining high capacity utilization. The proposed approach provides a practical decision-support tool for production planning and lot-splitting scheduling in the ABF substrate manufacturing industry.