半導體廠房之坡地外管線整合研究

A Study on the Integration of External Utility Pipelines for Fabs on Slopeland

檔案

日期

2026

類型

語言

中文

摘要

隨著全球半導體產業快速成長,台灣作為關鍵製造基地,先進製程廠房的擴建需求日益殷切。因平地用地資源有限,部分高科技廠區開始規劃於坡地建廠。然而,相較於傳統平地基地,坡地在地形條件、施工空間與法規限制等方面均面臨高度挑戰,尤其在半導體廠房所仰賴的外管線設施(包含161kV電力、自來水、天然氣、大宗氣體、電信及污水處理等)在配置與施工上,需克服顯著高低差、空間干涉與共構工程協作等問題。透過本人所參與某半導體廠房擴建計劃為個案,探討在坡地地形中外管線的整合設計與施作過程將會面對的五大限制,包括:地形高差、單一引入點、公共工程同步開發、水土保持與環評規範限制,以及壓縮工期所衍生之施工風險。個案中採用多種數位工具來輔助規劃與整合作業,包含GIS空間資料分析、透地雷達實測、Civil 3D土方模擬、SketchUp量體配置、建築資訊模型(BIM)Revit檢討與 UAV 空拍監控,於設計與施工各階段分別建立整合對策。結果顯示,在多重限制條件下,透過合理分段設計(如豎井式共同管道、高架吊掛方式)、多階段模擬檢討與施工協作調度,能有效提升外管線配置效率與安全性,並降低重工與系統風險。最後彙整設計流程與整合經驗,提出可供未來類似坡地基地開發時參考之外管線整合標準作業流程,強化高科技建廠工程在困難地形下之規劃能力與建置效率。
With the rapid growth of the global semiconductor industry, Taiwan, as a key semiconductor manufacturing hub, has experienced increasing demand for the expansion of advanced semiconductor fabrication facilities (fabs). Due to the limited availability of flat land, some high-tech industrial facilities have begun to consider slopeland sites for new construction and expansion. Compared with conventional flat sites, slopeland development presents greater challenges arising from complex topographic conditions, restricted construction space, and regulatory constraints. In particular, the external utility pipelines essential to fab operations—including 161 kV power supply, municipal water, natural gas, bulk gases, telecommunications, and wastewater systems—must overcome significant elevation differences, spatial conflicts, and complex coordination interfaces with concurrent infrastructure works during planning, design, and construction. Based on a fab expansion project in which the author directly participated, this study investigates the integrated design and implementation of external utility pipelines under slopeland conditions. Five major constraints are identified: significant elevation differences, a single utility entry point, concurrent development of public infrastructure, regulatory requirements related to soil and water conservation and environmental impact assessment, and construction risks arising from compressed project schedules. To support planning and multidisciplinary integration, this study employs multiple digital tools and investigation methods, including Geographic Information System (GIS) spatial data analysis, Ground-Penetrating Radar (GPR) surveys, earthwork simulation using Civil 3D, massing and spatial configuration using SketchUp, Building Information Modeling (BIM) coordination using Revit, and Unmanned Aerial Vehicle (UAV) monitoring. These tools and methods are applied at different stages of design and construction to establish corresponding integration and coordination strategies. The results indicate that, under multiple site and project constraints, the layout efficiency and construction safety of external utility pipelines can be effectively improved through rational segmented design strategies, such as vertical-shaft utility tunnels and elevated pipe-support systems, combined with multi-stage simulation and review, multidisciplinary coordination, and coordinated construction sequencing. These approaches also contribute to reducing rework, spatial conflicts, and system-related risks. Finally, this study consolidates the design procedures and integration experience derived from the case study and proposes a Standard Operating Procedure (SOP) for external utility pipeline integration as a reference for future fab developments under similar slopeland conditions. The proposed framework is expected to enhance the planning capability and implementation efficiency of high-tech facility projects in complex terrain.
顯示完整詮釋資料 統計資料

引用此條目

呂宛諭 (2026). 半導體廠房之坡地外管線整合研究. https://thesis.lib.nycu.edu.tw/handle/20.500.14371/89449

BibTeX RIS

引用文字依 APA 第 7 版格式自動產生,使用前請再核對。

分享

永久網址:https://thesis.lib.nycu.edu.tw/handle/20.500.14371/89449