隨著營建產業數位轉型,建築資訊模型(Building Information Modeling, BIM)已成為工程管理之核心技術。其中,在設計與施工階段透過BIM進行衝突檢討,可協助工程人員提早發現模型元件間之硬碰撞(Hard clash),以及因時間、空間需求或使用條件所產生之軟碰撞(Soft clash),進而降低後續設計變更與施工修改所衍生之成本。然而,目前BIM衝突檢討之項目、時機及處理方式多仰賴工程人員之實務經驗,尚缺乏系統化之整理與應用方式;此外,不同工程階段之檢討重點亦有所差異,使相關經驗不易累積與傳承,對缺乏實務經驗之工程人員而言,更難以系統性掌握BIM衝突檢討之內容與方法。
為解決上述問題,本研究根據十件實際工程案例,系統化歸納與分析其發生之BIM衝突檢討項目及其處理經驗,彙整成BIM衝突檢討項目表,並據此提出一套BIM衝突檢討方法。本研究首先依工程專業將衝突檢討內容劃分為七大專業領域,包括基礎工程、結構工程、建築工程、門窗工程、裝修工程、景觀工程及電梯工程等,並進一步歸納為9種類別(包括假設工程、擋土工程等類別)及65項具體衝突檢討項目。而針對各項衝突檢討項目,本研究進一步彙整其相應之建議改善對策,並納入BIM元件品類及檢討時機等檢索條件,以建立衝突檢討項目、模型元件、檢討時機與處理方式間之對應關係。在此基礎上,本研究提出此BIM衝突檢討項目表之應用流程,協助工程人員依據不同工程階段與模型資訊進行衝突檢討及查詢過往相關處理經驗。綜合而言,本研究成果可作為BIM衝突檢討知識管理與系統化作業之參考,協助工程人員掌握不同工程階段之檢討項目、檢討時機及相應處理方式,並促進BIM衝突檢討經驗之累積、再利用與傳承。
With the digital transformation of the construction industry, Building Information Modeling (BIM) has become a core technology for engineering management. In particular, conducting clash reviews through BIM during the design and construction phases enables engineering personnel to identify hard clashes between model components, as well as soft clashes arising from temporal, spatial, or functional requirements, at an early stage. This process can further reduce the costs associated with subsequent design changes and construction modifications. However, the selection of clash review items, the timing of reviews, and the approaches used to resolve clashes still largely depend on the practical experience of engineering personnel, and systematic methods for organizing and applying such knowledge remain insufficient. In addition, the focus of clash reviews varies across different project phases, making it difficult to accumulate and transfer relevant experience. Consequently, engineering personnel with limited practical experience may encounter difficulties in systematically understanding the scope and methods of BIM clash reviews.

To address these issues, this study systematically summarizes and analyzes the BIM clash review items and corresponding resolution experiences identified from ten actual construction projects. The findings are compiled into a BIM clash review checklist, based on which a systematic BIM clash review methodology is proposed. First, the review content was classified into seven major engineering disciplines, including foundation works, structural works, architectural works, doors and windows, interior finishing works, landscape works, and elevator works. These were further categorized into nine categories, including temporary works and retaining works, resulting in a total of 65 specific clash review items. For each clash review item, corresponding recommended improvement measures were further compiled and incorporated together with retrieval criteria, such as BIM component categories and appropriate review timing, to establish relationships among clash review items, model components, review timing, and resolution methods. Based on these findings, this study proposes an application process for the BIM clash review checklist to assist engineering personnel in conducting clash reviews according to different project phases and available model information, while also enabling them to retrieve relevant past resolution experiences.

Overall, the results of this study can serve as a reference for the knowledge management and systematic implementation of BIM clash reviews. The proposed approach can assist engineering personnel in identifying appropriate review items, review timing, and corresponding resolution methods at different project phases, thereby promoting the accumulation, reuse, and transfer of BIM clash review experience.
顯示完整詮釋資料 統計資料

引用此條目

陳文哲 (2026). 透過案例分析BIM衝突檢討流程與衝突類型及解決方法. https://thesis.lib.nycu.edu.tw/handle/20.500.14371/91015

BibTeX RIS

引用文字依 APA 第 7 版格式自動產生,使用前請再核對。

分享

永久網址:https://thesis.lib.nycu.edu.tw/handle/20.500.14371/91015