河川橋梁快速與詳細沖刷深度評估與應用研究
Combining Rapid and Detailed Bridge Scour Assessment and its Application
摘要
本研究提出河川橋梁快速與詳細沖刷深度推估流程,利用一維與二維水理模式建置,搭配河川各重現期洪水情境,與橋墩沖刷評估公式,快速與詳細推估橋墩沖刷深度,藉以獲得流域各橋梁之可能最大沖刷深度,並以濁水溪主流為例,分析各橋墩沖刷深度與水位關係,訂定橋梁警戒值與封橋值,作為橋梁防災預警之參考。
研究成果顯示,一維快速評估模擬分析結果中,濁水溪主流之二水鐵路橋、名竹大橋與彰雲大橋沖刷深度較大。本研究進一步以二維數模評估二水鐵路橋與彰雲大橋河段,二水鐵路橋最易達到最大容許沖刷深度橋墩為第6號橋墩,橋梁警戒值與封橋值分別為96.7公尺與97.8公尺;而彰雲大橋於中低流量時,最大沖刷深度發生於第11號橋墩,而高流量事件時,第23號橋墩最易達最大容許沖刷深度,橋梁警戒值與封橋值分別為94.4公尺與95.4公尺。因模擬分析結果受地形與流域水文水理特性影響甚大,建議須不定期檢討分析並更新橋梁警戒值與封橋值。本研究所提橋墩沖刷深度推估作業流程可用於其他流域,惟需依研究區域特性審慎評估挑選橋梁沖刷經驗公式,以避免高估或低估等狀況發生。
研究成果顯示,一維快速評估模擬分析結果中,濁水溪主流之二水鐵路橋、名竹大橋與彰雲大橋沖刷深度較大。本研究進一步以二維數模評估二水鐵路橋與彰雲大橋河段,二水鐵路橋最易達到最大容許沖刷深度橋墩為第6號橋墩,橋梁警戒值與封橋值分別為96.7公尺與97.8公尺;而彰雲大橋於中低流量時,最大沖刷深度發生於第11號橋墩,而高流量事件時,第23號橋墩最易達最大容許沖刷深度,橋梁警戒值與封橋值分別為94.4公尺與95.4公尺。因模擬分析結果受地形與流域水文水理特性影響甚大,建議須不定期檢討分析並更新橋梁警戒值與封橋值。本研究所提橋墩沖刷深度推估作業流程可用於其他流域,惟需依研究區域特性審慎評估挑選橋梁沖刷經驗公式,以避免高估或低估等狀況發生。
This study proposes rapid and detailed estimation processes of river bridge scour depth, by appling one-dimensional and two-dimensional hydraulic models, combined with flood scenarios in each recurrence period of the river and bridge pier scour evaluation formulas to rapidly and detailedly estimate the possible maximum scour depth of each bridge in the mainstream of Zhuoshui River, respectively. We analyzed the relation between the scour depth of each bridge pier and the water level, which is used to determine the bridge warning level and closure level, as a reference for bridge disaster prevention warning .
The research results show that in the one-dimensional rapid assessment simulation analysis, the Ershui Railway Bridge, the Mingzhu Bridge and the Zhangyun Bridge have greater scour depths. Then the two-dimensional numerical model is adopted to evaluate the scour depths at the Ershui Railway Bridge and the Zhangyun Bridge. The maximum scour depth occurred at the No. 6 pier of Ershui Railway Bridge, and the bridge warning level and the bridge closure level are 96.7 meters and 97.8 meters, respectively. During low or medium water flow events, the maximum scour depth of the Zhangyun Bridge occured at Pier No. 11. Nevertheless, the Pier No. 23 is the most dangerous pier of Zhangyun Bridge during a high water flow event. The warning level and closure level of the bridge are 94.4 meters and 95.4 meters, respectively. Because the analytical results of the simulation are greatly affected by the topography and the hydrological condition of the river basin, it is recommended that the bridge warning level and the bridge closure level should be reviewed and analyzed from time to time. The estimating procedures for pier scour depth proposed in this research can also be applied to other river basins. However, the empirical formula for bridge scour should be carefully evaluated and selected according to the characteristics of the study area to avoid overestimation or underestimation.
The research results show that in the one-dimensional rapid assessment simulation analysis, the Ershui Railway Bridge, the Mingzhu Bridge and the Zhangyun Bridge have greater scour depths. Then the two-dimensional numerical model is adopted to evaluate the scour depths at the Ershui Railway Bridge and the Zhangyun Bridge. The maximum scour depth occurred at the No. 6 pier of Ershui Railway Bridge, and the bridge warning level and the bridge closure level are 96.7 meters and 97.8 meters, respectively. During low or medium water flow events, the maximum scour depth of the Zhangyun Bridge occured at Pier No. 11. Nevertheless, the Pier No. 23 is the most dangerous pier of Zhangyun Bridge during a high water flow event. The warning level and closure level of the bridge are 94.4 meters and 95.4 meters, respectively. Because the analytical results of the simulation are greatly affected by the topography and the hydrological condition of the river basin, it is recommended that the bridge warning level and the bridge closure level should be reviewed and analyzed from time to time. The estimating procedures for pier scour depth proposed in this research can also be applied to other river basins. However, the empirical formula for bridge scour should be carefully evaluated and selected according to the characteristics of the study area to avoid overestimation or underestimation.