河川橋梁快速與詳細沖刷深度評估與應用研究
顯示簡易詮釋資料 統計資料| 欄位 | 內容 | 語言 |
|---|---|---|
dc.contributor.advisor |
葉克家、楊昇學 | |
dc.contributor.advisor |
Yeh, Keh-Chia、Yang, Sheng-Hsueh | |
dc.contributor.author |
邱郁珺 | |
dc.contributor.author |
Chiu, Yu-Chun | |
dc.contributor.college |
工學院 | |
dc.contributor.committee |
王傳益 | |
dc.contributor.committee |
賴進松 | |
dc.contributor.committee |
楊昇學 | |
dc.contributor.committee |
葉克家 | |
dc.contributor.committee |
Wang, Chuan-Yi | |
dc.contributor.committee |
Lai, Jihn-sung | |
dc.contributor.committee |
Yang, Sheng-Hsueh | |
dc.contributor.committee |
Yeh, Keh-Chia | |
dc.contributor.department |
土木工程研究所 | |
dc.contributor.studentid |
0751245 | |
dc.date.NCLavailable |
不公開 | |
dc.date.USTavailable |
2024/01/26 | |
dc.date.issued |
2021 | |
dc.date.issuedROC |
110 | |
dc.date.paperavailable |
立即公開 | |
dc.date.schoolyear |
109 | |
dc.description.abstract |
本研究提出河川橋梁快速與詳細沖刷深度推估流程,利用一維與二維水理模式建置,搭配河川各重現期洪水情境,與橋墩沖刷評估公式,快速與詳細推估橋墩沖刷深度,藉以獲得流域各橋梁之可能最大沖刷深度,並以濁水溪主流為例,分析各橋墩沖刷深度與水位關係,訂定橋梁警戒值與封橋值,作為橋梁防災預警之參考。 研究成果顯示,一維快速評估模擬分析結果中,濁水溪主流之二水鐵路橋、名竹大橋與彰雲大橋沖刷深度較大。本研究進一步以二維數模評估二水鐵路橋與彰雲大橋河段,二水鐵路橋最易達到最大容許沖刷深度橋墩為第6號橋墩,橋梁警戒值與封橋值分別為96.7公尺與97.8公尺;而彰雲大橋於中低流量時,最大沖刷深度發生於第11號橋墩,而高流量事件時,第23號橋墩最易達最大容許沖刷深度,橋梁警戒值與封橋值分別為94.4公尺與95.4公尺。因模擬分析結果受地形與流域水文水理特性影響甚大,建議須不定期檢討分析並更新橋梁警戒值與封橋值。本研究所提橋墩沖刷深度推估作業流程可用於其他流域,惟需依研究區域特性審慎評估挑選橋梁沖刷經驗公式,以避免高估或低估等狀況發生。 | |
dc.description.abstract |
This study proposes rapid and detailed estimation processes of river bridge scour depth, by appling one-dimensional and two-dimensional hydraulic models, combined with flood scenarios in each recurrence period of the river and bridge pier scour evaluation formulas to rapidly and detailedly estimate the possible maximum scour depth of each bridge in the mainstream of Zhuoshui River, respectively. We analyzed the relation between the scour depth of each bridge pier and the water level, which is used to determine the bridge warning level and closure level, as a reference for bridge disaster prevention warning . The research results show that in the one-dimensional rapid assessment simulation analysis, the Ershui Railway Bridge, the Mingzhu Bridge and the Zhangyun Bridge have greater scour depths. Then the two-dimensional numerical model is adopted to evaluate the scour depths at the Ershui Railway Bridge and the Zhangyun Bridge. The maximum scour depth occurred at the No. 6 pier of Ershui Railway Bridge, and the bridge warning level and the bridge closure level are 96.7 meters and 97.8 meters, respectively. During low or medium water flow events, the maximum scour depth of the Zhangyun Bridge occured at Pier No. 11. Nevertheless, the Pier No. 23 is the most dangerous pier of Zhangyun Bridge during a high water flow event. The warning level and closure level of the bridge are 94.4 meters and 95.4 meters, respectively. Because the analytical results of the simulation are greatly affected by the topography and the hydrological condition of the river basin, it is recommended that the bridge warning level and the bridge closure level should be reviewed and analyzed from time to time. The estimating procedures for pier scour depth proposed in this research can also be applied to other river basins. However, the empirical formula for bridge scour should be carefully evaluated and selected according to the characteristics of the study area to avoid overestimation or underestimation. | |
dc.description.abstractopendate |
||
dc.description.degree |
碩士 | |
dc.description.tableofcontents |
摘要 IAbstract II誌謝 IV目錄 V表目錄 VIII圖目錄 X附表目錄 XIV附圖目錄 XVI符號說明 XIX第一章 緒論 11.1 研究動機 11.2 研究目的 11.3 文獻回顧 21.3.1 沖刷形式分類 21.3.2 沖刷經驗公式 41.3.3 橋墩沖刷水流特性 111.3.4 橋墩沖淤平衡 131.3.5 沖刷因子探討 141.3.6 等效橋墩寬度(equivalent width) 211.4 研究流程 251.5 本文組織 27第二章 研究方法 282.1 Sobek模式介紹 282.1.1 降雨逕流模式 282.1.2 一維渠流模式 312.1.3 二維漫地流模式 312.1.4 多重尺度網格 322.2 橋墩沖刷評估作業流程制定 332.2.1 一維快速評估方法 332.2.2 二維詳細評估方法 33第三章 研究區域模式建置 363.1 一維快速評估建模 363.1.1 濁水溪流域基本資料蒐集 363.1.2 Sobek一維定床水理模式建置 413.1.3 一維快速評估模擬案例 513.2 二維詳細評估建模 563.2.1 研究河段基本資料蒐集 573.2.2 Sobek二維定床水理模式建置 583.2.3 二維定床水理模式模擬案例 62第四章 結果與討論 664.1 沖刷公式適用性評估 664.2 一維模式案例結果 714.2.1 2年重現期距一維案例結果 714.2.2 一維快速評估案例結果討論 734.3 二維模式案例結果 864.3.1 2年重現期距二維案例結果 864.3.2 100年重現期距二維案例結果 954.3.3 二維詳細評估案例結果討論 1044.4 一維快速與二維詳細模擬結果比較 1074.5 橋梁警戒與封橋值訂定 1114.6 水情物聯網資訊應用 117第五章 結論與建議 1195.1 結論 1195.2 建議 120參考文獻 122附錄A一維案例結果 128附錄B二維案例結果 137 | |
dc.identifier.citation |
1. Amini, A. and Mohammed, T. A. (2017). “Local scour prediction around piers with complex geometry.” Marine Georesources & Geotechnologys, Vol. 35, No. 6, 857-864.2. Baghbadorani, D. A., Ashtiani, B. A., Beheshti, A., Hadjzaman, M., and Jamali, M. (2018). “Prediction of current-induced local scour around complex piers: Review, revisit, and integration.” Coastal Engineering, Vol. 133, No. 133, 43-58.3. Baker, C. J. (1980). “Theoretical approach to prediction of local scour around bridge piers.” Journal of Hydraulic Research, Vol. 18, No. 1, 1-12.4. Breusers, H. N. C., Nicollet, G., and Shen, H. W. (1977). “ Local scour around cylindrical piers.” Journal of Hydraulic Research, Vol. 15, No. 3, 211-252.5. Breusers, H. N. C. and Raudkivi, A. J. (1991). “Scouring.” AA Balkema.6. Chabert, J. and Engeldinger, P. (1956). “Study of scour around bridge piers.” Rep. Prepared for the Laboratoire National d’Hydraulique.7. Coleman, N.L. (1971). “Analyzing laboratory measurements of scour at cylindrical piers in sand beds”, Proc., 14th IAHR Congress, Vol. 3.8. Dargahi, B. (1990). “Controlling mechanism of local scouring.” Journal of Hydraulic Engineering, Vol. 116, No. 10, 1197-1214.9. Ettema, R., Mostafa, E. A., Melville, B. W., and Yassin, A. A. (1998). “Local scour at skewed piers.” ournal of the Hydraulics Division, ASCE, Vol. 124, No. 7, 756-760.10. Froehlich, D. C. (1991). “Upper confidence limit of local pier-scour predictions.” Transportation Research Record, 1290.11. Gill, M. A. (1981). “Bed erosion in rectangular long contraction.” Journal of the Hydraulics Division, Vol. 107, No. 3, 273-284.12. Inglis, C. C. (1949). “The behaviour and control of rivers and canals: Res. ” Publication, Cent. Bd. Irrig. India, 13.13. Jain, S. C., and Fischer, E. E. (1980). “Scour around bridge piers at high flow velocitys.” Journal of the Hydraulics Division, ASCE, 106 (HY11).14. Jalal, H. K. and Hassan, W. H. (2020). “Effect of Bridge Pier Shape on Depth of Scour.” IOP Conference Series: Materials Science and Engineering , Vol. 671, No. 1, 012001.15. Jones, J. S., Kilgore, R. T., and Mistichelli, M. P. (1992). “Effects of footing location on bridge pier scour.” Journal of Hydraulic Engineering, Vol. 118, No. 2, 280-290.16. Laursen, E. M. (1958). “Scour at bridge crossings”, Bulletin No.8, Iowa Highway Research Board, Ames, Iowa, USA.17. Laursen, E. M. (1960). “Scour at bridge crossings.” Journal of the Hydraulics Division, Vol. 86, No. 2, 39-54.18. Laursen, E. M. (1962). “Scour at bridge crossings” Transactions, ASCE, Vol. 127, Part 1, 116-119.19. Laursen, E. M. and Toch, A. (1956). “Scour around bridge piers and abutments.” Bulletin No.4, Iowa Highways Research Board, Ames, IA.20. Melville, B. W. (1997). “Pier and Abutment Scour-an Integrated Approach” Journal of Hydraulic Engineering, ASCE, Vol. 123, No. 2, 125-136.21. Melville, B. W. and Chiew, Y. M. (1999). “Time scale for local scour at bridge piers.” Journal of Hydraulic Engineering, Vol. 125, No. 1, 59-65.22. Melville, B. W. and Coleman, S. E. (2000). “Bridge Scour.” Water Resources Publications, LLC., Highlands Ranch, Colorado, USA.23. Melville, B. W. and Raudkivi, A. J. (1977). “Flow characteristics in local scour at bridge piers.” Journal of Hydraulic Research, Vol. 15, No. 4, 373-380.24. Melville, B. W. and Raudkivi, A. J. (1996). “Effects of foundation geometry on bridge pier scour.” Journal of Hydraulic Engineering, Vol. 122, No. 4, 203-209.25. Melville, B. W. and Sutherland, A. J. (1988). “Design method for local scour at bridge piers.” Journal of Hydraulic Engineering, Vol. 114, No. 10, 1210-1226.26. Nordin, C. F. (1971). “Graphical aids for determining scour depth in long contraction.” Unpublished note (obtained from private communication).27. Neill, C. R. (1964) “River bed scour - a review for engineers” Canadian Good 88 Roads Association, Technical Publication No.23.28. Raudkivi, A. J. (1986). “Functional trends of scour at bridge piers.” J. Hydraulic Engineering., ASCE, Vol. 112, No. 1, 1-13.29. Raudkivi, A. J. and Ettema, R. (1977). “Effect of sediment gradation on clear water scour.” Journal of the Hydraulics Division, Vol. 103, No. 10, 1209-1213.30. Raudkivi, A. J. and Ettema, R. (1983). “Clear-water scour at cylindrical piers.” Journal of hydraulic engineering, Vol. 109, No. 3, 338-350.31. Raudkivi, A. J. (1986). “Functional trends of scour at bridge piers.” Journal of hydraulic engineering, Vol. 112, No. 1, 1-13.32. Richardson, E. V. and Davis, S. R. (1995). “Evaluating scour at bridges: Federal highway administration hydraulic engineering circular no. 18. ” Publication FHWA-IP-90-017.33. Richardson, E. V. and Davis, S. R. (2001). “Evaluating scour at bridges.” Fourth Edition. Federal Highway Administration, Washington D.C.34. Shen, H. W., Schneider, V. R., and Karaki, S. (1969). “Local scour around bridge piers.” Journal of the Hydraulics Division, Vol 95, No. 6, 1919-1940.35. Shen, H. W., Schneider, V. R., and Karaki, S. S. (1966). “Mechanism of local scour” Engineering Research Center, Colorado State Univ. Fort Collins, Colorado.36. Sheppard, D. M. and Renna, R. (2005). “Bridge scour manual.” Florida Department of Transportation, Florida.37. Sheppard, D. M. and Miller, W. (2006). “Live-bed local pier scour experiments.” Journal of Hydraulic Engineering-ASCE, Vol. 132, No. 7, 635-642.38. Tison, L. J. (1940). “Erosion autour des piles de ponts en riviere.” Annales des Travaux publics de Belgique, Vol. 41, No. 6, 813-817.39. Wang, C., Yu, X., and Liang, F. (2017). “A review of bridge scour: mechanism, estimation, monitoring and countermeasures.” Natural Hazards, Vol. 87, No. 3, 1881-1906.40. Sobek使用手冊。41. 水利地理資訊服務平台https://gic.wra.gov.tw/gis/42. 王傳益、黃奕超、施漢鵬、鄭人豪(2011)「變量流流況下非均勻縱列雙橋墩局部沖刷之研究」,農業工程學報,第57卷,第1期, 35-45。43. 台灣世曦工程顧問股份有限公司(2020)「橋梁沖刷評估與防災管理模組開發」。44. 白烈燑、王慶豐、陳進興、徐瑞宏、黃皇嘉(2013)「濁水溪流域颱風降雨特性」,第45卷,第2期,641-652。45. 交通部(2009),「交通技術標準規範公路類公路工程部公路排水設計規範」。46. 交通部臺灣區國道高速公路局中區工程處(2017),「國1中沙大橋、烏溪橋及國3濁水溪橋墩基保護方案暨精進沖刷巡檢機制專業技術服務工作」。47. 交通部公路總局(2010),「封橋標準作業程序」。48. 交通部運輸研究所(2011),「橋墩沖刷計算模式之建立研究」。49. 交通部運輸研究所(2015),「跨河橋梁安全分析與水位監測之研究(2/2)」。50. 交通部公路總局第五區養護工程處(2010),「轄區9座橋梁訂定封橋水位」。51. 交通部臺灣區國道高速公路局中區工程處(2016),「國道跨河橋梁及臨溪路堤之雲端資料庫建置暨沖刷資料調查評估委託專業服務工作」。52. 李夢文(2018),「底床覆蓋高度對群樁橋墩局部沖刷影響之研究」,國立交通大學土木工程學系碩士論文,臺灣新竹。53. 李宗棋、劉建邦、廖翊鈞(2011),「跨河橋梁之封橋水位機制-以台 1 線八掌溪橋與157 線蒜頭大橋為例」,地工技術,第127期,79-86。54. 吳建民(1967),「橋墩沖刷之試驗研究」,水利復刊,第5期,38-49。55. 林呈(2012),「橋梁水力災害學」,科技圖書股份有限公司。56. 林呈、李秉融(2003),「臺中市旱溪東門橋桃芝颱洪橋基塌陷之成 因探討」,臺灣公路工程,第29卷,第8期,1-34。57. 林呈、高明哲、蔡榮峻、何鴻文(2007)「橋基沖刷災害與相關之維護管理(2)—橋梁沖刷監測預警系統及其功能評析」,臺灣公路工程,第33卷,第1期,2-38。58. 卓佳駿(2014),「應用水理模式快速推估橋墩附近沖刷深度」,國立中興大學水土保持學系碩士論文,臺灣臺中。59. 國家災害防救科技中心全球災害事件簿https://den.ncdr.nat.gov.tw/60. 國立交通大學防災中心水資訊平台http://140.113.136.108/61. 張文鎰(2002),「圓形橋墩局部沖刷之模擬與試驗驗證」,國立臺灣大學土木工程研究所博士論文,臺灣臺北。62. 張藝馨(2000),「不均勻圓形橋墩之局部沖刷研究」,國立中央大學土木工程研究所碩士論文,臺灣桃園。63. 彭明正(2008),「變量流作用下非均勻橋墩之局部沖刷量測與模擬」,國立中興大學土木工程學系碩士論文,臺灣臺中。64. 經濟部水利署水利規劃試驗所(2007),「濁水溪治理規劃檢討」。65. 經濟部水利署水利規劃試驗所(2011),「濁水溪流域整理治理規劃檢討」。66. 經濟部水利署(2015),「濁水溪水系支流南清水溝溪治理規劃檢討」。67. 經濟部水利署(2010),「濁水溪水系支流塔羅灣溪治理規劃報告」。68. 經濟部水利署(2002),「東埔蚋溪治理規劃檢討報告」。69. 經濟部水利署(2020),「中央管河川與區域排水警戒水位資料庫建置(108-109年)(2/2)」。70. 經濟部水利署第四河川局(2017),「濁水溪水系支流水里溪治理規劃檢討報告」。 | |
dc.identifier.uri |
https://hdl.handle.net/20.500.14371/76708 | |
dc.language.iso |
中文 | |
dc.relation.alma |
991003592924106772 | |
dc.relation.page |
173 | |
dc.subject.keyword |
一維水文水理模式 | |
dc.subject.keyword |
二維水理模式 | |
dc.subject.keyword |
橋墩沖刷 | |
dc.subject.keyword |
橋梁防災預警 | |
dc.subject.keyword |
one-dimensional hydraulic model | |
dc.subject.keyword |
Two-dimensional hydraulic model | |
dc.subject.keyword |
bridge pier scour | |
dc.subject.keyword |
bridge disaster warning | |
dc.title |
河川橋梁快速與詳細沖刷深度評估與應用研究 | zh-TW |
dc.title |
Combining Rapid and Detailed Bridge Scour Assessment and its Application | en |
dc.type |
Thesis | zh-TW |
檔案
全文未公開。
所屬典藏: 土木工程學系